|
| AD | SC | SFC | ||
| A | B | A | B | ||
| Constructs | 12 | 10 | 5 | 6 | 6 |
| Symbols | 9 | 11 | 11 | 18 | 10 |
| Excess in % | 0 | 0 | 20 | 0 | 0 |
| Deficit in % | 0 | 0 | 0 | 0 | 0 |
| Redundancy in % | 8.3 | 20 | 20 | 50 | 33.3 |
| Overload in % | 25 | 10 | 20 | 0 | 0 |
| Total anomaly in % | 33.3 | 30 | 60 | 50 | 33.3 |
| Net Symbol Balance | 10 | 11 | 6 | 9 | 8 |