|
| MILP model | |||||||
| Scenarios | Non-capacitated (NC) | Capacitated (C) | ||||||
| Open DCs | Comp. time | Total cost (106 Km) | Open DCs | Comp. time | Total cost (106 Km) | |||
| 1 | Allocating the municipality-customers to the existing DC in Poços de Caldas. | A | 00:00:01 | 820 | A | 00:00:01 | 820 | |
| 2 | Opening a new DC, before the existing DC in Poços de Caldas. | A, B | 00:00:58 | 461 | A, D | 00:01:15 | 500 | |
| 3 | Opening two new DCs, before the existing DC in Poços de Caldas. | A, B, C | 00:15:38 | 383 | A, F, G | 00:33:57 | 410 | |
| 4 | Opening three new DCs, before the existing DC in Poços de Caldas. | A, C, D, E | 01:44:10 | 315 | A, B, E, F | 01:06:05 | 353 | |