Specific risk factors | Weights |
Lack of rational planning and design | 0.08404 |
Operational stage supervision is not in place | 0.075181 |
Disturbance in construction management | 0.074535 |
Do not follow the relevant operating procedures | 0.068036 |
Do not comply with relevant regulations | 0.065627 |
Lack of emphasis on safety | 0.057858 |
Geological exploration factors | 0.057201 |
Late maintenance is not in place | 0.055807 |
Completion without construction inspection | 0.055029 |
natural factors | 0.054789 |
Unreasonable construction process and technology | 0.048136 |
Construction material quality is not qualified | 0.047739 |
Ground subsidence collapse | 0.045806 |
Quality Warranty Insurance System | 0.042983 |
Regulatory charters and other theoretical factors | 0.038633 |
Unfamiliar with the blind construction of soil paper | 0.038066 |
Construction program factors | 0.034855 |
Not according to plan construction | 0.033836 |
Material properties change | 0.024634 |