El-Kharga

Hurghada

Month

MBE

RMSE

MPE%

R2

t-Test

Month

MBE

RMSE

MPE%

R2

t-Test

J.

15.32

22.35

7.32

0.957

5.36

J.

13.24

17.68

6.58

0.958

4.32

F.

19.32

25.47

8.56

0.963

6.32

F.

15.85

21.34

9.45

0.978

7.65

M.

11.45

28.56

9.31

0.987

4.32

M.

16.84

23.75

8.56

0.969

5.31

A.

11.27

18.32

6.54

0.974

3.45

A.

8.65

15.98

7.35

0.957

4.89

M.

−8.79

15.47

7.34

0.962

3.21

M.

6.58

14.32

6.25

0.972

5.64

J.

7.38

28.32

5.48

0.982

2.95

J.

−5.32

19.74

7.21

0.959

3.65

J.

9.34

16.32

4.32

0.992

2.24

J.

7.32

15.86

4.69

0.975

3.89

A.

5.24

11.27

2.35

0.985

2.95

A.

6.57

13.24

3.45

0.963

2.15

S.

6.47

15.47

8.32

0.973

3.48

S.

4.35

9.35

6.89

0.954

1.89

O.

12.35

17.36

9.65

0.968

4.68

O.

8.36

14.25

5.78

0.948

3.65

N.

15.78

24.35

7.65

0.957

3.56

N.

9.57

16.38

4.32

0.957

2.45

D.

18.25

26.59

9.37

0.949

5.64

D.

11.28

19.57

8.32

0.966

3.78

Dammam

Hail

Month

MBE

RMSE

MPE%

R2

t-Test

Month

MBE

RMSE

MPE%

R2

t-Test

J.

17.35

21.32

6.32

0.976

6.89

J.

−9.26

18.36

5.21

0.952

5.32

F.

20.65

23.54

9.56

0.982

5.21

F.

15.32

22.34

8.32

0.969

4.38

M.

15.47

25.78

7.25

0.991

3.21

M.

11.32

24.21

6.47

0.975

2.36

A.

13.65

21.32

5.32

0.954

4.26

A.

−15.32

19.65

7.69

0.964

3.48

M.

−7.25

17.32

6.78

0.962

5.28

M.

8.32

15.41

5.24

0.951

4.24

J.

−9.65

19.32

8.32

0.958

4.69

J.

13.45

18.32

4.32

0.969

4.83

J.

11.32

17.32

6.18

0.969

3.65

J.

7.35

14.28

4.98

0.987

2.68

A.

8.32

14.89

4.32

0.957

3.21

A.

6.45

11.82

3.26

0.973

5.36

S.

14.35

18.32

4.36

0.948

5.24

S.

9.34

9.32

5.32

0.962

6.47

O.

15.72

19.65

5.68

0.963

3.62

O.

11.47

14.75

6.89

0.951

4.28

N.

12.68

22.78

4.12

0.969

4.22

N.

14.59

17.39

8.45

0.978

2.31

D.

16.35

23.24

7.29

0.972

6.58

D.

10.45

19.84

6.18

0.956

5.11