PV | Load Class 1 | |||
Site | LCOE range £/kWh | lowest avg P/L at 10% cost of capital | highest avg P/L at 0% cost of capital | highest minus lowest |
IV1 | 0.132 - 0.580 | −£2783.00 | £3074.00 | £5857.00 |
CA2 | 0.134 - 0.569 | −£2688.00 | £3032.00 | £5720.00 |
YO24 | 0.115 - 0.530 | −£2351.00 | £3431.00 | £5782.00 |
KT2 | 0.118 - 0.491 | −£2013.00 | £3368.00 | £5381.00 |
SY23 | 0.106 - 0.448 | −£1641.00 | £3620.00 | £5261.00 |
TR14 | 0.105 - 0.432 | −£1503.00 | £3641.00 | £5144.00 |
PV | Load Class 3 | |||
IV1 | 0.132 - 0.580 | −£2665.00 | £3394.00 | £6059.00 |
CA2 | 0.134 - 0.569 | −£2570.00 | £3352.00 | £5922.00 |
YO24 | 0.115 - 0.530 | −£2233.00 | £3751.00 | £5984.00 |
KT2 | 0.118 - 0.491 | −£1895.00 | £3688.00 | £5583.00 |
SY23 | 0.106 - 0.448 | −£1523.00 | £3940.00 | £5463.00 |
TR14 | 0.105 - 0.432 | −£1385.00 | £3961.00 | £5346.00 |