LCOE | Production Credit | Inflation assumption | Cost of Capital | Hierachy 1 consumption % | Hierachy 2 consumption % | Hierachy 3 consumption % | |
Parameter | up | up | up | up | up | up | up |
P/L | down | up | up | down | up | up | down |
Hierachy 1 Network Charge | Hierachy 2 Network Charge | Hierachy 1 Admin Charge | Hierachy 2 Admin Charge | Back up Price Grid Electricity | Sellback Price to Grid | Grid Price Electricity | |
Parameter | up | up | up | up | up | up | up |
P/L | down | down | down | down | down | up | up |