Id number of items | Item content | Mean (SD) |
Factor 1 | Perceived bus route punctuality (α = 0.81, Aiic = 0.58, Ev = 31%) | 3.62 (0.86) |
T1 | The bus company lays down a strict travel schedule. | 3.71 (1.00) |
T2 | Several fines would be imposed if each driving round is not completed on time. | 3.51 (1.07) |
T3 | Several benefits would be earned if driving schedules are completed on time. | 3.64 (0.97) |
Factor 2 | Perceived bus route organization (α = 0.87, Aiic = 0.68, Ev = 34%) | 3.24 (0.94) |
T5 | Working shifts are too long. | 3.25 (1.06) |
T6 | Working shifts are too late. | 3.19 (1.07) |
T7 | The bus route is too long. | 3.28 (1.04) |