| Facility Name | Facility Category | Facility Status | Country | Operational | Facility Industry |
| In Salah CO2 Storage | Commercial CCS Facility | Completed | Algeria | 2004 | Natural Gas Processing |
| Bridgeport Energy Moonie CCUS project | Commercial CCS Facility | Advanced Development | Australia | 2023 | CO2 Transport and Storage |
| Burrup CCS Hub | Commercial CCS Facility | Early Development | Australia |
| CO2 Transport and Storage |
| Callide Oxyfuel Project | Pilot and Demonstration CCS Facility | Completed | Australia | 2012 | Power Generation |
| CarbonNet | Commercial CCS Facility | Advanced Development | Australia |
| CO2 Transport and Storage |
| Cliff Head CCS Project (Mid West Clean Energy Project) | Commercial CCS Facility | Advanced Development | Australia | 2025 | CO2 Transport and Storage |
| CO2CRC Otway | Pilot and Demonstration CCS Facility | Operational | Australia | 2008 | Natural Gas Processing |
| CTSCo Surat Basin CCS Project | Pilot and Demonstration CCS Facility | Advanced Development | Australia | 2023 | Power Generation |
| Gorgon Carbon Dioxide Injection | Commercial CCS Facility | Operational | Australia | 2019 | Natural Gas Processing |
| Hazelwood Carbon Capture and Mineral Sequestration Pilot Plant | Pilot and Demonstration CCS Facility | Completed | Australia | 2009 | Power Generation |
| Hydrogen Energy Supply Chain (HESC) project | Commercial CCS Facility | Advanced Development | Australia |
| Hydrogen Production |
| Hydrogen Energy Supply Chain (HESC) project | Pilot and Demonstration CCS Facility | Completed | Australia | 2028 | Hydrogen Production |
| INPEX CCS Project Darwin | Commercial CCS Facility | Early Development | Australia | 2026 | Natural Gas Processing |
| Mid-West Modern Energy Hub | Commercial CCS Facility | Early Development | Australia |
| Hydrogen Production |
| Moomba CCS hub (Santos Cooper Basin CCS Project) | Commercial CCS Facility | In Construction | Australia | 2024 | Hydrogen Production |
| National Geosequestration Laboratory (NGL) Australia | Pilot and Demonstration CCS Facility | Operational | Australia | 2015 | Research and Development |
| Otway Natural Gas Plant CCS | Commercial CCS Facility | Early Development | Australia | 2026 | Natural Gas Processing |
| Post-Combustion Capture (PCC)@CSIRO | Pilot and Demonstration CCS Facility | Operational | Australia | 2005 | Power Generation |
| South East Australia Carbon Capture Hub | Commercial CCS Facility | Early Development | Australia | 2025 | Natural Gas Processing |
| South West Hub | Pilot and Demonstration CCS Facility | Completed | Australia |
| Fertiliser Production |
| Wallumbilla Renewable Methane Demonstration Project | Pilot and Demonstration CCS Facility | Advanced Development | Australia | 2021 | Direct Air Capture |
| Antwerp@C—BASF Antwerp CCS | Commercial CCS Facility | Advanced Development | Belgium | 2030 | Chemical Production |
| Antwerp@C—Exxonmobil Antwerp Refinery CCS | Commercial CCS Facility | Early Development | Belgium | 2030 | Chemical Production |
| Antwerp@C—Borealis Antwerp CCS | Commercial CCS Facility | Early Development | Belgium | 2030 | Chemical Production |
| Antwerp@C—Ineos Antwerp CCS | Commercial CCS Facility | Early Development | Belgium | 2030 | Chemical Production |
| LEILAC | Pilot and Demonstration CCS Facility | In Construction | Belgium | 2025 | Cement Production |
| Steelanol | Utilisation Facilities | Operational | Belgium | 2023 | Iron and Steel Production |
| FS Lucas do Rio Verde BECCS Project | Commercial CCS Facility | Early Development | Brazil |
| Ethanol Production |
| Miranga CO2 Injection Project | Pilot and Demonstration CCS Facility | Completed | Brazil | 2009 | Fertiliser Production |
| Petrobras Santos Basin Pre-Salt Oil Field CCS | Commercial CCS Facility | Operational | Brazil | 2008 | Natural Gas Processing |
| Air Products Net-Zero Hydrogen Energy Complex | Commercial CCS Facility | Advanced Development | Canada | 2024 | Hydrogen Production |
| Alberta Carbon Conversion Technology Centre (ACCTC) | Pilot and Demonstration CCS Facility | Operational | Canada | 2018 | Power Generation |
| Alberta Carbon Trunk Line (ACTL) | Commercial CCS Facility | Operational | Canada | 2020 | CO2 Transport and Storage |
| Blue But Better | Commercial CCS Facility | In Construction | Canada | 2024 | Hydrogen Production |
| Boundary Dam Unit 3 Carbon Capture and Storage Facility (BD3 CCS facility) | Commercial CCS Facility | Operational | Canada | 2014 | Power Generation |
| Capital Power Genesee CCS Project | Commercial CCS Facility | Advanced Development | Canada | 2026 | Power Generation |
| Caroline Carbon Capture Power Complex | Commercial CCS Facility | Early Development | Canada | 2025 | Power Generation |
| CMC Research Institutes (CMCRI) | Pilot and Demonstration CCS Facility | Operational | Canada | 2018 | Research and Development |
| CO2 Solutions Valleyfield Carbon Capture Demonstration Project | Pilot and Demonstration CCS Facility | Completed | Canada | 2015 | Research and Development |
| Enhance Energy Clive CO2-EOR (ACTL) | Commercial CCS Facility | Operational | Canada | 2020 | CO2 Transport and Storage |
| Federated Co-operatives Limited (Ethanol) | Commercial CCS Facility | Advanced Development | Canada | 2024 | Ethanol Production |
| Federated Co-operatives Limited (Refinery) | Commercial CCS Facility | Advanced Development | Canada | 2026 | Oil Refining |
| Glacier Gas Plant MCCS | Commercial CCS Facility | Operational | Canada | 2022 | Natural Gas Processing |
| Husky Energy Lashburn and Tangleflags CO2 Injection in Heavy Oil Reservoirs Project | Pilot and Demonstration CCS Facility | Operational | Canada | 2012 | Ethanol Production |
| Nauticol Energy Net Zero Methanol (ACTL) | Commercial CCS Facility | Early Development | Canada | 2025 | Methanol Production |
| Northwest Redwater CO2 Recovery Unit Sturgeon Refinery (ACTL) | Commercial CCS Facility | Operational | Canada | 2020 | Oil Refining |
| Origins Project Carbon Storage Hub | Commercial CCS Facility | Early Development | Canada | 2026 | CO2 Transport and Storage |
| Pembina Cardium CO2 Monitoring Pilot | Pilot and Demonstration CCS Facility | Completed | Canada | 2005 | Natural Gas Processing |
| Polaris CCS Project | Commercial CCS Facility | Early Development | Canada | 2025 | Hydrogen Production |
| Quest | Commercial CCS Facility | Operational | Canada | 2015 | Hydrogen Production |
| Saskatchewan NET Power Plant | Commercial CCS Facility | Early Development | Canada | 2025 | Power Generation |
| Shand Carbon Capture Test Facility (CCTF) | Pilot and Demonstration CCS Facility | Operational | Canada | 2015 | Research and Development |
| Southeast Saskatchewan CCUS Hub-S torage | Commercial CCS Facility | Advanced Development | Canada |
| CO2 Transport and Storage |
| Svante and Husky Energy VeloxoTherm Capture Process Test | Pilot and Demonstration CCS Facility | Advanced Development | Canada | 2018 | Oil Refining |
| WCS Redwater CO2 Recovery Unit (ACTL) | Commercial CCS Facility | Operational | Canada | 2020 | Fertiliser Production |
| Zama Field Validation Test | Pilot and Demonstration CCS Facility | Completed | Canada | 2005 | Natural Gas Processing |
| Australia-China Post Combustion Capture (PCC) Feasibility Study Project | Pilot and Demonstration CCS Facility | Completed | China | 2010 | Power Generation |
| Australia-China Post Combustion Capture (PCC) Feasibility Study Project | Pilot and Demonstration CCS Facility | Completed | China | 2010 | Power Generation |
| China Coalbed Methane Technology Sequestration Project | Pilot and Demonstration CCS Facility | Completed | China | 2004 | Research and Development |
| China National Energy Guohua Jinjie | Commercial CCS Facility | Operational | China | 2020 | Power Generation |
| China National Energy Taizhou | Commercial CCS Facility | In Construction | China | 2023 | Power Generation |
| Chinese-European Emission-Reducing Solutions (CHEERS) | Pilot and Demonstration CCS Facility | Advanced Development | China | 2022 | Oil Refining |
| CNOOC Enping CCS Offshore Project | Commercial CCS Facility | Operational | China | 2023 | Natural Gas Processing |
| CNPC Jilin Oil Field CO2 EOR | Commercial CCS Facility | Operational | China | 2018 | Natural Gas Processing |
| CNPC Jilin Oil Field EOR Demonstration Project | Pilot and Demonstration CCS Facility | Completed | China | 2008 | Natural Gas Processing |
| Daqing Oil Field EOR Demonstration Project | Pilot and Demonstration CCS Facility | Operational | China | 2003 | Natural Gas Processing |
| Guanghui Energy CCUS | Commercial CCS Facility | In Construction | China |
| Methanol Production |
| Haifeng Carbon Capture Test Platform | Pilot and Demonstration CCS Facility | Operational | China | 2018 | Power Generation |
| Huaneng GreenGen IGCC Demonstration-scale System (Phase 2) | Pilot and Demonstration CCS Facility | In Construction | China | 2025 | Power Generation |
| Huaneng Longdong Energy Base Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | China | 2023 | Power Generation |
| ITRI Calcium Looping Pilot | Pilot and Demonstration CCS Facility | Operational | China | 2013 | Cement Production |
| Jinling Petrochemical CCUS (Nanjing Refinery) | Commercial CCS Facility | Operational | China | 2023 | Oil Refining |
| Karamay Dunhua Oil Technology CCUS EOR Project | Commercial CCS Facility | Operational | China | 2015 | Methanol Production |
| PetroChina Changqing Oil Field EOR CCUS | Pilot and Demonstration CCS Facility | Operational | China | 2017 | Fuel transformation |
| Shenhua Group Ordos Carbon Capture and Storage (CCS) Demonstration Project | Pilot and Demonstration CCS Facility | Completed | China | 2011 | Fuel transformation |
| Shuncheng CO2-TO-METHANOL Anyang Petrochemical | Utilisation Facilities | Operational | China | 2022 | Chemical Production |
| Sinopec Nanjing Chemical Industries CCUS Cooperation Project | Commercial CCS Facility | Operational | China | 2021 | Chemical Production |
| Sinopec Qilu-Shengli CCUS Project | Commercial CCS Facility | Operational | China | 2022 | Chemical Production |
| Sinopec Shengli Oilfield Carbon Capture Utilization and Storage Pilot Project | Pilot and Demonstration CCS Facility | Operational | China | 2010 | Power Generation |
| Sinopec Shengli Power Plant CCS | Commercial CCS Facility | Advanced Development | China | 2025 | Power Generation |
| Sinopec Zhongyuan Carbon Capture Utilization and Storage | Pilot and Demonstration CCS Facility | Completed | China | 2006 | Chemical Production |
| Yanchang Integrated CCS Demonstration | Commercial CCS Facility | Operational | China | 2012 | Chemical Production |
| Geothermal Plant with CO2 Re-injection | Pilot and Demonstration CCS Facility | Operational | Croatia | 2018 | Power Generation |
| CASTOR | Pilot and Demonstration CCS Facility | Completed | Denmark | 2006 | Power Generation |
| CESAR | Pilot and Demonstration CCS Facility | Completed | Denmark | 2008 | Power Generation |
| Copenhill (Amager Bakke) Waste to Energy CCS | Commercial CCS Facility | Advanced Development | Denmark | 2025 | Waste Incineration |
| Greenport Scandinavia | Commercial CCS Facility | Early Development | Denmark | 2025 | Bioenergy |
| Project Greensand | Commercial CCS Facility | Advanced Development | Denmark | 2025 | CO2 Transport and Storage |
| Air Liquide CalCC | Commercial CCS Facility | Early Development | France | 2028 | Lime Production |
| Air Liquide Normandy CCS | Commercial CCS Facility | Early Development | France | 2025 | Hydrogen Production |
| C2A2 Field Pilot—Le Havre | Pilot and Demonstration CCS Facility | Completed | France | 2013 | Power Generation |
| DMXTM Demonstration in Dunkirk | Pilot and Demonstration CCS Facility | Operational | France | 2022 | Iron and Steel Production |
| K6 | Commercial CCS Facility | Early Development | France | 2028 | Cement Production |
| Lacq CCS Pilot Project | Pilot and Demonstration CCS Facility | Completed | France | 2010 | Power Generation |
| CEMEX, Rüdersdorf, Germany | Commercial CCS Facility | Early Development | Germany | 2026 | Cement Production |
| Ketzin Pilot Project | Pilot and Demonstration CCS Facility | Completed | Germany | 2004 | Power Generation |
| Schwarze Pumpe Oxy-fuel Pilot Plant | Pilot and Demonstration CCS Facility | Completed | Germany | 2008 | Power Generation |
| Wilhelmshaven CO2 Capture Pilot Plant | Pilot and Demonstration CCS Facility | Completed | Germany | 2012 | Power Generation |
| MOL Szank field CO2 EOR | Commercial CCS Facility | Operational | Hungary | 1992 | Natural Gas Processing |
| CarbFix Project | Pilot and Demonstration CCS Facility | Operational | Iceland | 2012 | Power Generation |
| CODA Shipping | Commercial CCS Facility | Advanced Development | Iceland | 2026 | CO2 Transport and Storage |
| CODA Terminal Onshore Infrastructure | Commercial CCS Facility | Advanced Development | Iceland | 2026 | CO2 Transport and Storage |
| CODA Terminal Pipeline | Commercial CCS Facility | Advanced Development | Iceland | 2026 | CO2 Transport and Storage |
| CODA Terminal Storage | Commercial CCS Facility | Advanced Development | Iceland | 2026 | CO2 Transport and Storage |
| Mammoth | Commercial CCS Facility | In Construction | Iceland | 2024 | Direct Air Capture |
| Orca | Commercial CCS Facility | Operational | Iceland | 2021 | Direct Air Capture |
| Carbon Clean Solutions Solvay Vishnu Capture Project | Pilot and Demonstration CCS Facility | Completed | India | 2012 | Power Generation |
| NTPC Vindhyachal Super Thermal Power Station CCS | Utilisation Facilities | Operational | India | 2022 | Power Generation |
| Tata Steel Jamshedpur Steel Plant | Pilot and Demonstration CCS Facility | Operational | India | 2021 | Iron and Steel Production |
| Tuticorin (TTPS)—Carbon Clean Solution | Utilisation Facilities | Operational | India | 2016 | Power Generation |
| Tuticorin Alkali Chemicals and Fertilizers Ltd | Pilot and Demonstration CCS Facility | Operational | India | 2016 | Chemical Production |
| Arun CCS Hub | Commercial CCS Facility | Early Development | Indonesia | 2029 | CO2 Transport and Storage |
| Gundih CCS Pilot | Pilot and Demonstration CCS Facility | Advanced Development | Indonesia | 2025 | Natural Gas Processing |
| PAU Central Sulawesi Clean Fuel Ammonia Production with CCUS | Commercial CCS Facility | Early Development | Indonesia | 2025 | Fertiliser Production |
| Repsol Sakakemang Carbon Capture and Injection | Commercial CCS Facility | Early Development | Indonesia | 2026 | Natural Gas Processing |
| Sukowati CCUS | Commercial CCS Facility | Early Development | Indonesia | 2028 | Oil Refining |
| Ervia Cork CCS | Commercial CCS Facility | Early Development | Ireland | 2028 | Power Generation |
| Heletz, Israel pilot CO2 injection site | Pilot and Demonstration CCS Facility | Completed | Israel | 2026 | Research and Development |
| Brindisi CO2 Capture Pilot Plant | Pilot and Demonstration CCS Facility | Completed | Italy | 2010 | Power Generation |
| Ravenna CCS Hub | Commercial CCS Facility | Early Development | Italy | 2027 | CO2 Transport and Storage |
| COURSE 50—CO2 Ultimate Reduction in Steelmaking Process by Innovative Technology for Cool Earth 50 | Pilot and Demonstration CCS Facility | Operational | Japan | 2008 | Iron and Steel Production |
| EAGLE | Pilot and Demonstration CCS Facility | Completed | Japan | 2002 | Power Generation |
| Kashiwazaki Clean Hydrogen/ Ammonia Project | Pilot and Demonstration CCS Facility | In Construction | Japan | 2024 | Hydrogen Production |
| Mikawa Post Combustion Capture Demonstration Plant | Pilot and Demonstration CCS Facility | Operational | Japan | 2020 | Power Generation |
| Nagaoka CO2 Storage Project | Pilot and Demonstration CCS Facility | Completed | Japan | 2003 | Natural Gas Processing |
| Osaki CoolGen Project | Pilot and Demonstration CCS Facility | In Construction | Japan | 2020 | Power Generation |
| Taiheiyo Cement Corporation | Pilot and Demonstration CCS Facility | Operational | Japan | 2021 | Cement Production |
| Tomakomai CCS Demonstration Project | Pilot and Demonstration CCS Facility | Operational | Japan | 2016 | Hydrogen Production |
| Kasawari | Commercial CCS Facility | In Construction | Malaysia | 2025 | Natural Gas Processing |
| Lang Lebah CCS | Commercial CCS Facility | Advanced Development | Malaysia | 2026 | Natural Gas Processing |
| Air Liquide Refinery Rotterdam CCS | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | Hydrogen Production |
| Air Products Refinery Rotterdam CCS | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | Hydrogen Production |
| Buggenum Carbon Capture (CO2 Catch-up) Pilot Project | Pilot and Demonstration CCS Facility | Completed | Netherlands | 2011 | Power Generation |
| Delta Corridor Pipeline Network | Commercial CCS Facility | Early Development | Netherlands | 2026 | CO2 Transport and Storage |
| ExxonMobil Benelux Refinery CCS | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | Hydrogen Production |
| Hydrogen 2 Magnum (H2M) | Commercial CCS Facility | Early Development | Netherlands | 2024 | Power Generation |
| K12-B CO2 Injection Project | Pilot and Demonstration CCS Facility | Completed | Netherlands | 2004 | Natural Gas Processing |
| L10 Carbon Capture and Storage | Commercial CCS Facility | Early Development | Netherlands | 2026 | Hydrogen Production |
| Porthos—Compressor Station | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | CO2 Transport and Storage |
| Porthos—Offshore Pipeline | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | CO2 Transport and Storage |
| Porthos—Onshore Pipeline | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | CO2 Transport and Storage |
| Porthos Storage | Commercial CCS Facility | Advanced Development | Netherlands | 2024 | CO2 Transport and Storage |
| Shell Energy and Chemicals Park Rotterdam | Commercial CCS Facility | In Construction | Netherlands | 2024 | Bioenergy |
| Yara Sluiskil | Commercial CCS Facility | Early Development | Netherlands | 2025 | Fertiliser Production |
| Zeeland Refinery Azur | Commercial CCS Facility | Early Development | Netherlands | 2026 | Hydrogen Production |
| Project Pouakai Hydrogen Production with CCS | Commercial CCS Facility | Early Development | New Zealand | 2024 | Hydrogen Production |
| Barents Blue | Commercial CCS Facility | Early Development | Norway | 2025 | Fertiliser Production |
| Borg CO2 | Commercial CCS Facility | Early Development | Norway |
| CO2 Transport and Storage |
| CEMCAP | Pilot and Demonstration CCS Facility | Completed | Norway | 2015 | Cement Production |
| CO2 Capture Test Facility at Norcem Brevik | Pilot and Demonstration CCS Facility | Completed | Norway | 2013 | Cement Production |
| Equinor Smeaheia (Norway) | Commercial CCS Facility | Early Development | Norway | 2028 | CO2 Storage |
| Fortum Oslo Varme—Shipping Route | Commercial CCS Facility | Early Development | Norway | 2025 | Waste Incineration |
| Hafslund Oslo Celsio | Commercial CCS Facility | In Construction | Norway | 2024 | Waste Incineration |
| Hafslund Oslo Celsio—Truck Route | Commercial CCS Facility | Advanced Development | Norway | 2025 | Waste Incineration |
| Norcem Brevik—Cement Plant | Commercial CCS Facility | In Construction | Norway | 2024 | Cement Production |
| Norcem Brevik—Shipping Route | Commercial CCS Facility | In Construction | Norway | 2024 | Cement Production |
| Northern Lights—Pipeline | Commercial CCS Facility | Early Development | Norway | 2024 | CO2 Transport and Storage |
| Northern Lights—Storage | Commercial CCS Facility | In Construction | Norway | 2024 | CO2 Transport and Storage |
| Polaris Carbon Storage | Commercial CCS Facility | Advanced Development | Norway | 2024 | Hydrogen Production |
| Sleipner CCS Project | Commercial CCS Facility | Operational | Norway | 1996 | Natural Gas Processing |
| Snohvit CO2 Storage | Commercial CCS Facility | Operational | Norway | 2008 | Natural Gas Processing |
| Technology Centre Mongstad (TCM) | Pilot and Demonstration CCS Facility | Operational | Norway | 2012 | Oil Refining |
| Project Hajar | Commercial CCS Facility | In Construction | Oman | 2024 | Direct Air Capture |
| Papua LNG CCS | Commercial CCS Facility | Early Development | Papua New Guinea | 2027 | Natural Gas Processing |
| GO4ECOPLANET | Commercial CCS Facility | Early Development | Poland | 2027 | Cement Production |
| North Field East Project (NFE) CCS | Commercial CCS Facility | In Construction | Qatar | 2025 | Natural Gas Processing |
| Qatar LNG CCS | Commercial CCS Facility | Operational | Qatar | 2019 | Natural Gas Processing |
| Novatek Yamal LNG CCS | Commercial CCS Facility | Early Development | Russia | 2027 | Natural Gas Processing |
| Uthmaniyah CO2-EOR Demonstration | Commercial CCS Facility | Operational | Saudi Arabia | 2015 | Natural Gas Processing |
| Pilot Carbon Storage Project (PCSP)—Zululand Basin, South Africa | Pilot and Demonstration CCS Facility | Advanced Development | South Africa | 2020 | Under Evaluation |
| Boryeong—KoSol Process for CO2 Capture (KPCC) Test | Pilot and Demonstration CCS Facility | Completed | South Korea | 2010 | Power Generation |
| Hadong—Dry-sorbent CO2 Capture System Test | Pilot and Demonstration CCS Facility | Completed | South Korea | 2014 | Power Generation |
| Korea-CCS 1 & 2 | Commercial CCS Facility | Early Development | South Korea | 2025 | Power Generation |
| CIUDEN: CO2 Capture & Transport Technology Development Plant | Pilot and Demonstration CCS Facility | Completed | Spain | 2012 | Power Generation |
| CIUDEN: CO2 Storage Technology Development Plant | Pilot and Demonstration CCS Facility | Operational | Spain | 2015 | Research and Development |
| ELCOGAS Pre-combustion Carbon Capture Pilot Project: Puertollano | Pilot and Demonstration CCS Facility | Completed | Spain | 2010 | Power Generation |
| La Pereda Calcium Looping Pilot Plant | Pilot and Demonstration CCS Facility | Completed | Spain | 2012 | Power Generation |
| Cementa CCS (Slite Cement plant) | Commercial CCS Facility | Early Development | Sweden | 2030 | Cement Production |
| Cinfracap—Pipeline | Commercial CCS Facility | Early Development | Sweden | 2026 | CO2 Transport and Storage |
| Cinfracap—Shipping Route | Commercial CCS Facility | Early Development | Sweden | 2026 | CO2 Transport and Storage |
| Karlshamn Field Pilot | Pilot and Demonstration CCS Facility | Completed | Sweden | 2009 | Power Generation |
| Preem Refinery CCS | Commercial CCS Facility | Early Development | Sweden | 2025 | Hydrogen Production |
| STEPWISE Pilot of SEWGS Technology at Swerea/Mefos | Pilot and Demonstration CCS Facility | Operational | Sweden | 2017 | Iron and Steel Production |
| Stockholm Exergi BECCS | Commercial CCS Facility | Advanced Development | Sweden | 2027 | Bioenergy |
| Stockholm Exergi BECCS— Shipping Route | Commercial CCS Facility | Advanced Development | Sweden | 2027 | Bioenergy |
| PTTEP Arthit CCS | Commercial CCS Facility | Advanced Development | Thailand | TBC | Natural Gas Processing |
| Bayu-Undan CCS | Commercial CCS Facility | Advanced Development | Timor-Leste | 2027 | Natural Gas Processing |
| Abu Dhabi CCS (Phase 1 being Emirates Steel Industries) | Commercial CCS Facility | Operational | United Arab Emirates | 2016 | Iron and Steel Production |
| Abu Dhabi CCS Phase 2: Natural gas processing plant | Commercial CCS Facility | Advanced Development | United Arab Emirates | 2025 | Natural Gas Processing |
| Ghasha Concession Fields | Commercial CCS Facility | Advanced Development | United Arab Emirates | 2025 | Natural Gas Processing |
| Aberthaw Pilot Carbon Capture Facility | Pilot and Demonstration CCS Facility | Completed | United Kingdom | 2013 | Power Generation |
| Acorn | Commercial CCS Facility | Early Development | United Kingdom | 2024 | Hydrogen Production |
| Acorn (Minimum Viable CCS Development) | Pilot and Demonstration CCS Facility | Advanced Development | United Kingdom | 2025 | CO2 Transport and Storage |
| Acorn CO2 Pipeline | Commercial CCS Facility | Early Development | United Kingdom | 2026 | CO2 Transport and Storage |
| Acorn Direct Air Capture Facility | Commercial CCS Facility | Early Development | United Kingdom | 2026 | Hydrogen Production |
| Acorn Hydrogen | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Hydrogen Production |
| Acorn Storage Site | Commercial CCS Facility | Advanced Development | United Kingdom | 2025 | CO2 Transport and Storage |
| Buxton Lime Net Zero | Commercial CCS Facility | Early Development | United Kingdom | 2024 | Lime Production |
| Caledonia Clean Energy | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Power Generation |
| CF Fertilisers Billingham Ammonia CCS | Commercial CCS Facility | Early Development | United Kingdom | 2023 | Fertiliser Production |
| Damhead Pipeline (Medway Hub) | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| Damhead Power Station (Medway) | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| Drax BECCS Project | Commercial CCS Facility | Early Development | United Kingdom | 2027 | Power Generation |
| Drax bioenergy carbon capture pilot plant | Pilot and Demonstration CCS Facility | Operational | United Kingdom | 2019 | Power Generation |
| East Coast Cluster Humber Pipeline | Commercial CCS Facility | Advanced Development | United Kingdom | 2025 | CO2 Transport and Storage |
| East Coast Cluster Teesside Pipeline | Commercial CCS Facility | Advanced Development | United Kingdom | 2025 | CO2 Transport and Storage |
| Endurance Storage Site | Commercial CCS Facility | Advanced Development | United Kingdom | 2025 | CO2 Transport and Storage |
| Esmond and Forbes Carbon Storage (Medway Hub) | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| Ferrybridge Carbon Capture Pilot (CCPilot100+) | Pilot and Demonstration CCS Facility | Completed | United Kingdom | 2011 | Power Generation |
| Grain Power Station (Medway) | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| H2NorthEast | Commercial CCS Facility | Early Development | United Kingdom | 2027 | Hydrogen Production |
| Hydrogen to Humber Saltend | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Hydrogen Production |
| HyNet Hydrogen Production Project (HPP) | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Hydrogen Production |
| HyNet North West | Commercial CCS Facility | Early Development | United Kingdom | 2026 | Hydrogen Production |
| HyNet North West—Hanson Cement CCS | Commercial CCS Facility | Early Development | United Kingdom | 2026 | Cement Production |
| HyNet Pipeline | Commercial CCS Facility | Early Development | United Kingdom | 2025 | CO2 Transport and Storage |
| Hynet Storage Site | Commercial CCS Facility | Early Development | United Kingdom | 2025 | CO2 Transport and Storage |
| Isle of Grain LNG Terminal (Medway Hub) | Commercial CCS Facility | Early Development | United Kingdom | 2026 | Power Generation |
| Keady 3 CCS Power Station | Commercial CCS Facility | Early Development | United Kingdom | 2027 | Power Generation |
| Killingholme Power Station | Commercial CCS Facility | Early Development | United Kingdom | 2027 | Hydrogen Production |
| Medway Hub Shipping | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| Medway Power Station | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| NET Power Plant (East Coast Cluster) | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Power Generation |
| Net Zero Teesside—CCGT Facility | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Power Generation |
| Net Zero Teesside—BP H2Teesside | Commercial CCS Facility | Early Development | United Kingdom | 2027 | Hydrogen Production |
| Northern Gas Network H21 North of England | Commercial CCS Facility | Early Development | United Kingdom | 2026 | Hydrogen Production |
| Pembroke Power Station | Commercial CCS Facility | Early Development | United Kingdom | 2030 | Power Generation |
| Peterhead CCS Power Station | Commercial CCS Facility | Advanced Development | United Kingdom | 2026 | Power Generation |
| Phillips 66 Humber Refinery CCS | Commercial CCS Facility | Advanced Development | United Kingdom | 2028 | Hydrogen Production |
| Prax Lindsey Carbon Capture Project (PLCCP) | Commercial CCS Facility | Advanced Development | United Kingdom | 2028 | Oil Refining |
| Redcar Energy Centre | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Power Generation |
| Renfrew Oxy-fuel (Oxycoal 2) Project | Pilot and Demonstration CCS Facility | Completed | United Kingdom | 2007 | Power Generation |
| Suez Waste to Energy CCS (East Coast Cluster) | Commercial CCS Facility | Early Development | United Kingdom | 2027 | Waste Incineration |
| Tees Valley Energy Recovery Facility Project (TVERF) | Commercial CCS Facility | Early Development | United Kingdom | 2026 | Bioenergy |
| UKCCSRC Pilot-scale Advanced Capture Technology (PACT) | Pilot and Demonstration CCS Facility | Completed | United Kingdom | 2012 | Power Generation |
| Vertex Hydrogen | Commercial CCS Facility | Early Development | United Kingdom | 2025 | Oil Refining |
| Viking CCS Pipeline | Commercial CCS Facility | Advanced Development | United Kingdom | 2027 | CO2 Transport and Storage |
| Viking CCS Storage Site | Commercial CCS Facility | Advanced Development | United Kingdom | 2027 | CO2 Transport and Storage |
| Viridor Runcorn Carbon Capture | Commercial CCS Facility | Early Development | United Kingdom |
| Waste Incineration |
| VPI Immingham Power Plant CCS | Commercial CCS Facility | Advanced Development | United Kingdom | 2027 | Power Generation |
| Whitetail Clean Energy | Commercial CCS Facility | Early Development | United Kingdom |
| Power Generation |
| ADM Illinois Industrial | Commercial CCS Facility | Operational | USA | 2017 | Ethanol Production |
| ArcelorMittal Texas (formerly voestalpine Texas) | Commercial CCS Facility | Early Development | USA |
| Iron and Steel Production |
| Arkalon CO2 Compression Facility | Commercial CCS Facility | Operational | USA | 2009 | Ethanol Production |
| Ascension Clean Energy (Louisiana) | Commercial CCS Facility | Early Development | USA | 2027 | Hydrogen Production |
| Atkinson Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Bayou Bend CCS | Commercial CCS Facility | Advanced Development | USA | 2025 | CO2 Transport and Storage |
| Baytown Low Carbon Hydrogen | Commercial CCS Facility | Advanced Development | USA | 2027 | Hydrogen Production |
| Bell Creek—Incidental CO2 Storage Associated with a Commercial EOR Project | Pilot and Demonstration CCS Facility | Operational | USA | 2010 | Natural Gas Processing |
| Bonanza BioEnergy CCUS EOR | Commercial CCS Facility | Operational | USA | 2012 | Ethanol Production |
| Borger CO2 Compression Facility | Commercial CCS Facility | Completed | USA | 2001 | Fertiliser Production |
| Bushmills Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Cal Capture | Commercial CCS Facility | Advanced Development | USA | 2027-28 | Power Generation |
| Cane Run CCS | Commercial CCS Facility | Early Development | USA |
| Power Generation |
| Carbon TerraVault I Project | Commercial CCS Facility | Early Development | USA | 2025 | CO2 Transport and Storage |
| CarbonFree Skymine | Utilisation Facilities | Operational | USA | 2015 | Cement Production |
| Casselton Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Central City Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Central Louisiana Regional Carbon Storage (CENLA) Hub | Commercial CCS Facility | In Construction | USA | 2027 | CO2 Transport and Storage |
| Century Plant | Commercial CCS Facility | Operational | USA | 2010 | Natural Gas Processing |
| Clean Energy Systems BiCRS Plant—Madera County | Commercial CCS Facility | Early Development | USA | 2027 | Power Generation |
| Clean Energy Systems Carbon Negative Energy Plant—Central Valley | Commercial CCS Facility | Early Development | USA | 2025 | Power Generation |
| CO2 Sequestration Field Test: Deep Unminable Lignite Seam | Pilot and Demonstration CCS Facility | Completed | USA | 2009 | Research and Development |
| Coastal Bend CCS | Commercial CCS Facility | Early Development | USA | 2026 | CO2 Transport and Storage |
| Coffeyville Gasification Plant | Commercial CCS Facility | Operational | USA | 2013 | Fertiliser Production |
| Core Energy CO2-EOR | Commercial CCS Facility | Operational | USA | 2003 | Natural Gas Processing |
| Coyote Clean Power Project | Commercial CCS Facility | Advanced Development | USA | 2025 | Power Generation |
| CPV Shay Energy Center (CPV West Virginia Natural Gas Power Station CCS) | Commercial CCS Facility | Early Development | USA |
| Power Generation |
| Cranfield Project | Pilot and Demonstration CCS Facility | Operational | USA | 2009 | Research and Development |
| Cyclus Power Generation | Commercial CCS Facility | Early Development | USA |
| Bioenergy |
| Dave Johnston Plant Carbon Capture | Commercial CCS Facility | Early Development | USA | 2025 | Power Generation |
| Deer Park Energy Centre CCS Project | Commercial CCS Facility | Advanced Development | USA |
| Power Generation |
| Diamond Vault CCS | Commercial CCS Facility | Early Development | USA | 2028 | Power Generation |
| Donaldsonville | Commercial CCS Facility | In Construction | USA | 2025 | Ammonia Production |
| Dry Fork Integrated Commercial Carbon Capture and Storage (CCS) | Commercial CCS Facility | Early Development | USA | 2025 | Power Generation |
| E.W. Brown 0.7 MWe Pilot Carbon Capture Unit | Pilot and Demonstration CCS Facility | Operational | USA | 2014 | Power Generation |
| El Dorado CCS Project | Commercial CCS Facility | Early Development | USA | 2026 | Fertiliser Production |
| Enid Fertilizer | Commercial CCS Facility | Operational | USA | 1982 | Fertiliser Production |
| Fairmont Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Farley DAC Project | Commercial CCS Facility | Advanced Development | USA |
| Direct Air Capture |
| Farnsworth Unit EOR Field Project—Development Phase | Pilot and Demonstration CCS Facility | Operational | USA | 2013 | Ethanol Production |
| Freeport LNG CCS project | Commercial CCS Facility | Cancelled | USA | 2024 | Natural Gas Processing |
| Frio Brine Pilot | Pilot and Demonstration CCS Facility | Completed | USA | 2004 | Research and Development |
| Fuel Cell Carbon Capture Pilot Plant | Pilot and Demonstration CCS Facility | Operational | USA | 2016 | Power Generation |
| G2 Net-Zero LNG | Commercial CCS Facility | Early Development | USA |
| Natural Gas Processing |
| Galva Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Gerald Gentleman Station Carbon Capture | Commercial CCS Facility | Advanced Development | USA | 2025 | Power Generation |
| Goldfield Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Grand Forks Blue Ammonia Capture plant | Commercial CCS Facility | Early Development | USA |
| Natural Gas Processing |
| Grand Junction Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Granite Falls Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Great Plains Synfuels Plant and Weyburn-Midale | Commercial CCS Facility | Operational | USA | 2000 | Hydrogen Production |
| Hackberry Carbon Sequestration Project (Sempra) | Commercial CCS Facility | Early Development | USA |
| CO2 Transport and Storage |
| Haynesville Gas Processing (CENLA Hub) | Commercial CCS Facility | In Construction | USA | 2027 | Natural Gas Processing |
| Heartland Greenway Storage | Commercial CCS Facility | Early Development | USA | 2025 | Ethanol Production |
| Heartland Hydrogen Hub | Commercial CCS Facility | Advanced Development | USA |
| Power Generation |
| HeidelbergCement CCS | Commercial CCS Facility | Advanced Development | USA | 2023 | Cement Production |
| Heron Lake Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Huron Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Illinois Allam-Fetvedt cycle power plant | Commercial CCS Facility | Early Development | USA | 2025 | Power Generation |
| Illinois Basin Decatur Project (CO2 Injection Completed, Monitoring Ongoing) | Pilot and Demonstration CCS Facility | Completed | USA | 2011 | Ethanol Production |
| James M. Barry Electric Generating Plant CCS Project | Commercial CCS Facility | Advanced Development | USA | 2030 | Power Generation |
| Kevin Dome Carbon Storage Project—Development Phase | Pilot and Demonstration CCS Facility | Completed | USA | 2013 | Research and Development |
| LafargeHolcim Cement Carbon capture | Commercial CCS Facility | Early Development | USA | 2025 | Cement Production |
| LafargeHolcim Ste. Genevieve Cement Plant CCS | Commercial CCS Facility | Early Development | USA |
| Cement Production |
| Lake Charles Methanol | Commercial CCS Facility | Advanced Development | USA | 2025 | Chemical Production |
| Lamberton Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Lawler Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Linde hydrogen plant for OCI fertilizer blue ammonia Beaumont | Commercial CCS Facility | In Construction | USA | 2025 | Hydrogen Production |
| Lone Cypress Hydrogen Project | Commercial CCS Facility | Early Development | USA | 2025 | Hydrogen Production |
| Lost Cabin Gas Plant | Commercial CCS Facility | Operational | USA | 2013 | Natural Gas Processing |
| Louisiana Clean Energy Complex | Commercial CCS Facility | In Construction | USA | 2025 | Hydrogen Production |
| Marcus Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Marshall County ECBM Project | Pilot and Demonstration CCS Facility | Completed | USA | 2009 | Research and Development |
| Mason City Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Mendota BECCS | Commercial CCS Facility | Early Development | USA | 2025 | Bioenergy |
| Merrill Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| MGSC Validation Phase (Phase II): CO2 Storage and Enhanced Oil Recovery: Bald Unit Oil Field Test Site | Pilot and Demonstration CCS Facility | Completed | USA | 2009 | Research and Development |
| MGSC Validation Phase (Phase II): CO2 Storage and Enhanced Oil Recovery: Sugar Creek Oil Field Test Site | Pilot and Demonstration CCS Facility | Completed | USA | 2009 | Research and Development |
| Michigan Basin (Phase II) Geologic CO2 Sequestration Field Test | Pilot and Demonstration CCS Facility | Completed | USA | 2008 | Natural Gas Processing |
| Michigan Basin Large-Scale Injection Test | Pilot and Demonstration CCS Facility | Operational | USA | 2013 | Natural Gas Processing |
| Midwest AgEnergy Blue Flint ethanol CCS | Commercial CCS Facility | Early Development | USA | 2022 | Ethanol Production |
| Mina Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Mountaineer Validation Facility | Pilot and Demonstration CCS Facility | Completed | USA | 2009 | Power Generation |
| Mt. Simon CCS Hub (Iowa Illinois Carbon Pipeline) | Commercial CCS Facility | Early Development | USA |
| CO2 Transport and Storage |
| Mustang Station of Golden Spread Electric Cooperative Carbon Capture | Commercial CCS Facility | Advanced Development | USA |
| Power Generation |
| National Carbon Capture Center (NCCC) | Pilot and Demonstration CCS Facility | Operational | USA | 2011 | Research and Development |
| NET Power Clean Energy Large-scale Pilot Plant | Pilot and Demonstration CCS Facility | Operational | USA | 2018 | Power Generation |
| Nevada Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| NextDecade Rio Grande LNG CCS | Commercial CCS Facility | Early Development | USA | 2025 | Natural Gas Processing |
| Norfolk Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Northern Delaware Basin CCS | Commercial CCS Facility | Advanced Development | USA | 2023 | Natural Gas Processing |
| NuDACCS—Nuclear Direct Air CCS Project | Pilot and Demonstration CCS Facility | Advanced Development | USA |
| Direct Air Capture |
| OCI Fertiliser | Commercial CCS Facility | In Construction | USA | 2025 | Fertiliser Production |
| One Earth Energy facility Carbon Capture | Commercial CCS Facility | Advanced Development | USA | 2025 | Ethanol Production |
| Onida Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Otter Tail Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Oxy-combustion of Heavy Liquid Fuels—15 MW Pilot Test | Pilot and Demonstration CCS Facility | Completed | USA | 2012 | Power Generation |
| PCS Nitrogen | Commercial CCS Facility | Operational | USA | 2013 | Fertiliser Production |
| Petra Nova Carbon Capture Project | Commercial CCS Facility | Operational | USA | 2017 | Power Generation |
| Plainview Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Plant Barry & Citronelle Integrated Project | Pilot and Demonstration CCS Facility | Completed | USA | 2012 | Power Generation |
| Plant Daniel Carbon Capture | Commercial CCS Facility | Advanced Development | USA |
| Power Generation |
| Pleasant Prairie Power Plant Field Pilot | Pilot and Demonstration CCS Facility | Completed | USA | 2008 | Power Generation |
| Polk Power Station CCS | Commercial CCS Facility | Advanced Development | USA | Under Evaluation | Power Generation |
| Prairie State Generating Station Carbon Capture | Commercial CCS Facility | Advanced Development | USA | 2025 | Power Generation |
| Project Interseqt—Hereford Ethanol Plant | Commercial CCS Facility | Early Development | USA | 2023 | Ethanol Production |
| Project Interseqt—Plainview Ethanol Plant | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Project Tundra | Commercial CCS Facility | Advanced Development | USA | 2026 | Power Generation |
| Red Trail Energy CCS | Commercial CCS Facility | Operational | USA | 2022 | Ethanol Production |
| Redfield Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| River Bend CCS Louisiana Pipeline | Commercial CCS Facility | Early Development | USA | 2026 | CO2 Transport and Storage |
| San Juan Basin ECBM Storage Test | Pilot and Demonstration CCS Facility | Completed | USA | 2008 | Research and Development |
| Shenandoah Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Shute Creek Gas Processing Plant | Commercial CCS Facility | Operational | USA | 1986 | Natural Gas Processing |
| Sioux Center Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Steamboat Rock Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| STRATOS (1PointFive Direct Air Capture) | Commercial CCS Facility | In Construction | USA | 2024 | Direct Air Capture |
| Summit Carbon Solutions— Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | CO2 Transport and Storage |
| Summit Pipeline | Commercial CCS Facility | Advanced Development | USA | 2024 | Bioenergy |
| Superior Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Terrell Natural Gas Processing Plant (formerly Val Verde Natural Gas Plants) | Commercial CCS Facility | Operational | USA | 1972 | Natural Gas Processing |
| The Illinois Clean Fuels Project | Commercial CCS Facility | Early Development | USA | 2025 | Chemical Production |
| Valero Port Arthur Refinery | Commercial CCS Facility | Operational | USA | 2013 | Hydrogen Production |
| Velocys’ Bayou Fuels Negative Emission Project | Commercial CCS Facility | Early Development | USA | 2026 | Chemical Production |
| Wabash CO2 Sequestration | Commercial CCS Facility | Advanced Development | USA | 2022 | Fertiliser Production |
| Watertown Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Wentworth Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| West Pearl Queen CO2 Sequestration Pilot Test and Modelling Project | Pilot and Demonstration CCS Facility | Completed | USA | 2002 | Research and Development |
| Wood River Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |
| Wyoming Integrated Test Center (ITC) | Pilot and Demonstration CCS Facility | Operational | USA | 2018 | Power Generation |
| York Biorefinery Carbon Capture and Storage | Commercial CCS Facility | Advanced Development | USA | 2024 | Ethanol Production |