Facility Name

Facility Category

Facility Status

Country

Operational

Facility Industry

In Salah CO2 Storage

Commercial CCS Facility

Completed

Algeria

2004

Natural Gas Processing

Bridgeport Energy Moonie CCUS project

Commercial CCS Facility

Advanced Development

Australia

2023

CO2 Transport and Storage

Burrup CCS Hub

Commercial CCS Facility

Early Development

Australia

CO2 Transport and Storage

Callide Oxyfuel Project

Pilot and Demonstration CCS Facility

Completed

Australia

2012

Power Generation

CarbonNet

Commercial CCS Facility

Advanced Development

Australia

CO2 Transport and Storage

Cliff Head CCS Project (Mid West Clean Energy Project)

Commercial CCS Facility

Advanced Development

Australia

2025

CO2 Transport and Storage

CO2CRC Otway

Pilot and Demonstration CCS Facility

Operational

Australia

2008

Natural Gas Processing

CTSCo Surat Basin CCS Project

Pilot and Demonstration CCS Facility

Advanced Development

Australia

2023

Power Generation

Gorgon Carbon Dioxide Injection

Commercial CCS Facility

Operational

Australia

2019

Natural Gas Processing

Hazelwood Carbon Capture and Mineral Sequestration Pilot Plant

Pilot and Demonstration CCS Facility

Completed

Australia

2009

Power Generation

Hydrogen Energy Supply Chain (HESC) project

Commercial CCS Facility

Advanced Development

Australia

Hydrogen Production

Hydrogen Energy Supply Chain (HESC) project

Pilot and Demonstration CCS Facility

Completed

Australia

2028

Hydrogen Production

INPEX CCS Project Darwin

Commercial CCS Facility

Early Development

Australia

2026

Natural Gas Processing

Mid-West Modern Energy Hub

Commercial CCS Facility

Early Development

Australia

Hydrogen Production

Moomba CCS hub (Santos Cooper Basin CCS Project)

Commercial CCS Facility

In Construction

Australia

2024

Hydrogen Production

National Geosequestration Laboratory (NGL) Australia

Pilot and Demonstration CCS Facility

Operational

Australia

2015

Research and Development

Otway Natural Gas Plant CCS

Commercial CCS Facility

Early Development

Australia

2026

Natural Gas Processing

Post-Combustion Capture (PCC)@CSIRO

Pilot and Demonstration CCS Facility

Operational

Australia

2005

Power Generation

South East Australia Carbon Capture Hub

Commercial CCS Facility

Early Development

Australia

2025

Natural Gas Processing

South West Hub

Pilot and Demonstration CCS Facility

Completed

Australia

Fertiliser Production

Wallumbilla Renewable Methane Demonstration Project

Pilot and Demonstration CCS Facility

Advanced Development

Australia

2021

Direct Air Capture

Antwerp@C—BASF Antwerp CCS

Commercial CCS Facility

Advanced Development

Belgium

2030

Chemical Production

Antwerp@C—Exxonmobil Antwerp Refinery CCS

Commercial CCS Facility

Early Development

Belgium

2030

Chemical Production

Antwerp@C—Borealis Antwerp CCS

Commercial CCS Facility

Early Development

Belgium

2030

Chemical Production

Antwerp@C—Ineos Antwerp CCS

Commercial CCS Facility

Early Development

Belgium

2030

Chemical Production

LEILAC

Pilot and Demonstration CCS Facility

In Construction

Belgium

2025

Cement Production

Steelanol

Utilisation Facilities

Operational

Belgium

2023

Iron and Steel Production

FS Lucas do Rio Verde BECCS Project

Commercial CCS Facility

Early Development

Brazil

Ethanol Production

Miranga CO2 Injection Project

Pilot and Demonstration CCS Facility

Completed

Brazil

2009

Fertiliser Production

Petrobras Santos Basin Pre-Salt Oil Field CCS

Commercial CCS Facility

Operational

Brazil

2008

Natural Gas Processing

Air Products Net-Zero Hydrogen Energy Complex

Commercial CCS Facility

Advanced Development

Canada

2024

Hydrogen Production

Alberta Carbon Conversion Technology Centre (ACCTC)

Pilot and Demonstration CCS Facility

Operational

Canada

2018

Power Generation

Alberta Carbon Trunk Line (ACTL)

Commercial CCS Facility

Operational

Canada

2020

CO2 Transport and Storage

Blue But Better

Commercial CCS Facility

In Construction

Canada

2024

Hydrogen Production

Boundary Dam Unit 3 Carbon Capture and Storage Facility (BD3 CCS facility)

Commercial CCS Facility

Operational

Canada

2014

Power Generation

Capital Power Genesee CCS Project

Commercial CCS Facility

Advanced Development

Canada

2026

Power Generation

Caroline Carbon Capture Power Complex

Commercial CCS Facility

Early Development

Canada

2025

Power Generation

CMC Research Institutes (CMCRI)

Pilot and Demonstration CCS Facility

Operational

Canada

2018

Research and Development

CO2 Solutions Valleyfield Carbon Capture Demonstration Project

Pilot and Demonstration CCS Facility

Completed

Canada

2015

Research and Development

Enhance Energy Clive CO2-EOR (ACTL)

Commercial CCS Facility

Operational

Canada

2020

CO2 Transport and Storage

Federated Co-operatives Limited (Ethanol)

Commercial CCS Facility

Advanced Development

Canada

2024

Ethanol Production

Federated Co-operatives Limited (Refinery)

Commercial CCS Facility

Advanced Development

Canada

2026

Oil Refining

Glacier Gas Plant MCCS

Commercial CCS Facility

Operational

Canada

2022

Natural Gas Processing

Husky Energy Lashburn and Tangleflags CO2 Injection in Heavy Oil Reservoirs Project

Pilot and Demonstration CCS Facility

Operational

Canada

2012

Ethanol Production

Nauticol Energy Net Zero Methanol (ACTL)

Commercial CCS Facility

Early Development

Canada

2025

Methanol Production

Northwest Redwater CO2 Recovery Unit Sturgeon Refinery (ACTL)

Commercial CCS Facility

Operational

Canada

2020

Oil Refining

Origins Project Carbon Storage Hub

Commercial CCS Facility

Early Development

Canada

2026

CO2 Transport and Storage

Pembina Cardium CO2 Monitoring Pilot

Pilot and Demonstration CCS Facility

Completed

Canada

2005

Natural Gas Processing

Polaris CCS Project

Commercial CCS Facility

Early Development

Canada

2025

Hydrogen Production

Quest

Commercial CCS Facility

Operational

Canada

2015

Hydrogen Production

Saskatchewan NET Power Plant

Commercial CCS Facility

Early Development

Canada

2025

Power Generation

Shand Carbon Capture Test Facility (CCTF)

Pilot and Demonstration CCS Facility

Operational

Canada

2015

Research and Development

Southeast Saskatchewan CCUS Hub-S torage

Commercial CCS Facility

Advanced Development

Canada

CO2 Transport and Storage

Svante and Husky Energy VeloxoTherm Capture Process Test

Pilot and Demonstration CCS Facility

Advanced Development

Canada

2018

Oil Refining

WCS Redwater CO2 Recovery Unit (ACTL)

Commercial CCS Facility

Operational

Canada

2020

Fertiliser Production

Zama Field Validation Test

Pilot and Demonstration CCS Facility

Completed

Canada

2005

Natural Gas Processing

Australia-China Post Combustion Capture (PCC) Feasibility Study Project

Pilot and Demonstration CCS Facility

Completed

China

2010

Power Generation

Australia-China Post Combustion Capture (PCC) Feasibility Study Project

Pilot and Demonstration CCS Facility

Completed

China

2010

Power Generation

China Coalbed Methane Technology Sequestration Project

Pilot and Demonstration CCS Facility

Completed

China

2004

Research and Development

China National Energy Guohua Jinjie

Commercial CCS Facility

Operational

China

2020

Power Generation

China National Energy Taizhou

Commercial CCS Facility

In Construction

China

2023

Power Generation

Chinese-European Emission-Reducing Solutions (CHEERS)

Pilot and Demonstration CCS Facility

Advanced Development

China

2022

Oil Refining

CNOOC Enping CCS Offshore Project

Commercial CCS Facility

Operational

China

2023

Natural Gas Processing

CNPC Jilin Oil Field CO2 EOR

Commercial CCS Facility

Operational

China

2018

Natural Gas Processing

CNPC Jilin Oil Field EOR Demonstration Project

Pilot and Demonstration CCS Facility

Completed

China

2008

Natural Gas Processing

Daqing Oil Field EOR Demonstration Project

Pilot and Demonstration CCS Facility

Operational

China

2003

Natural Gas Processing

Guanghui Energy CCUS

Commercial CCS Facility

In Construction

China

Methanol Production

Haifeng Carbon Capture Test Platform

Pilot and Demonstration CCS Facility

Operational

China

2018

Power Generation

Huaneng GreenGen IGCC Demonstration-scale System (Phase 2)

Pilot and Demonstration CCS Facility

In Construction

China

2025

Power Generation

Huaneng Longdong Energy Base Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

China

2023

Power Generation

ITRI Calcium Looping Pilot

Pilot and Demonstration CCS Facility

Operational

China

2013

Cement Production

Jinling Petrochemical CCUS (Nanjing Refinery)

Commercial CCS Facility

Operational

China

2023

Oil Refining

Karamay Dunhua Oil Technology CCUS EOR Project

Commercial CCS Facility

Operational

China

2015

Methanol Production

PetroChina Changqing Oil Field EOR CCUS

Pilot and Demonstration CCS Facility

Operational

China

2017

Fuel transformation

Shenhua Group Ordos Carbon Capture and Storage (CCS) Demonstration Project

Pilot and Demonstration CCS Facility

Completed

China

2011

Fuel transformation

Shuncheng CO2-TO-METHANOL Anyang Petrochemical

Utilisation Facilities

Operational

China

2022

Chemical Production

Sinopec Nanjing Chemical Industries CCUS Cooperation Project

Commercial CCS Facility

Operational

China

2021

Chemical Production

Sinopec Qilu-Shengli CCUS Project

Commercial CCS Facility

Operational

China

2022

Chemical Production

Sinopec Shengli Oilfield Carbon Capture Utilization and Storage Pilot Project

Pilot and Demonstration CCS Facility

Operational

China

2010

Power Generation

Sinopec Shengli Power Plant CCS

Commercial CCS Facility

Advanced Development

China

2025

Power Generation

Sinopec Zhongyuan Carbon Capture Utilization and Storage

Pilot and Demonstration CCS Facility

Completed

China

2006

Chemical Production

Yanchang Integrated CCS Demonstration

Commercial CCS Facility

Operational

China

2012

Chemical Production

Geothermal Plant with CO2 Re-injection

Pilot and Demonstration CCS Facility

Operational

Croatia

2018

Power Generation

CASTOR

Pilot and Demonstration CCS Facility

Completed

Denmark

2006

Power Generation

CESAR

Pilot and Demonstration CCS Facility

Completed

Denmark

2008

Power Generation

Copenhill (Amager Bakke) Waste to Energy CCS

Commercial CCS Facility

Advanced Development

Denmark

2025

Waste Incineration

Greenport Scandinavia

Commercial CCS Facility

Early Development

Denmark

2025

Bioenergy

Project Greensand

Commercial CCS Facility

Advanced Development

Denmark

2025

CO2 Transport and Storage

Air Liquide CalCC

Commercial CCS Facility

Early Development

France

2028

Lime Production

Air Liquide Normandy CCS

Commercial CCS Facility

Early Development

France

2025

Hydrogen Production

C2A2 Field Pilot—Le Havre

Pilot and Demonstration CCS Facility

Completed

France

2013

Power Generation

DMXTM Demonstration in Dunkirk

Pilot and Demonstration CCS Facility

Operational

France

2022

Iron and Steel Production

K6

Commercial CCS Facility

Early Development

France

2028

Cement Production

Lacq CCS Pilot Project

Pilot and Demonstration CCS Facility

Completed

France

2010

Power Generation

CEMEX, Rüdersdorf, Germany

Commercial CCS Facility

Early Development

Germany

2026

Cement Production

Ketzin Pilot Project

Pilot and Demonstration CCS Facility

Completed

Germany

2004

Power Generation

Schwarze Pumpe Oxy-fuel Pilot Plant

Pilot and Demonstration CCS Facility

Completed

Germany

2008

Power Generation

Wilhelmshaven CO2 Capture Pilot Plant

Pilot and Demonstration CCS Facility

Completed

Germany

2012

Power Generation

MOL Szank field CO2 EOR

Commercial CCS Facility

Operational

Hungary

1992

Natural Gas Processing

CarbFix Project

Pilot and Demonstration CCS Facility

Operational

Iceland

2012

Power Generation

CODA Shipping

Commercial CCS Facility

Advanced Development

Iceland

2026

CO2 Transport and Storage

CODA Terminal Onshore Infrastructure

Commercial CCS Facility

Advanced Development

Iceland

2026

CO2 Transport and Storage

CODA Terminal Pipeline

Commercial CCS Facility

Advanced Development

Iceland

2026

CO2 Transport and Storage

CODA Terminal Storage

Commercial CCS Facility

Advanced Development

Iceland

2026

CO2 Transport and Storage

Mammoth

Commercial CCS Facility

In Construction

Iceland

2024

Direct Air Capture

Orca

Commercial CCS Facility

Operational

Iceland

2021

Direct Air Capture

Carbon Clean Solutions Solvay Vishnu Capture Project

Pilot and Demonstration CCS Facility

Completed

India

2012

Power Generation

NTPC Vindhyachal Super Thermal Power Station CCS

Utilisation Facilities

Operational

India

2022

Power Generation

Tata Steel Jamshedpur Steel Plant

Pilot and Demonstration CCS Facility

Operational

India

2021

Iron and Steel Production

Tuticorin (TTPS)—Carbon Clean Solution

Utilisation Facilities

Operational

India

2016

Power Generation

Tuticorin Alkali Chemicals and Fertilizers Ltd

Pilot and Demonstration CCS Facility

Operational

India

2016

Chemical Production

Arun CCS Hub

Commercial CCS Facility

Early Development

Indonesia

2029

CO2 Transport and Storage

Gundih CCS Pilot

Pilot and Demonstration CCS Facility

Advanced Development

Indonesia

2025

Natural Gas Processing

PAU Central Sulawesi Clean Fuel Ammonia Production with CCUS

Commercial CCS Facility

Early Development

Indonesia

2025

Fertiliser Production

Repsol Sakakemang Carbon Capture and Injection

Commercial CCS Facility

Early Development

Indonesia

2026

Natural Gas Processing

Sukowati CCUS

Commercial CCS Facility

Early Development

Indonesia

2028

Oil Refining

Ervia Cork CCS

Commercial CCS Facility

Early Development

Ireland

2028

Power Generation

Heletz, Israel pilot CO2 injection site

Pilot and Demonstration CCS Facility

Completed

Israel

2026

Research and Development

Brindisi CO2 Capture Pilot Plant

Pilot and Demonstration CCS Facility

Completed

Italy

2010

Power Generation

Ravenna CCS Hub

Commercial CCS Facility

Early Development

Italy

2027

CO2 Transport and Storage

COURSE 50—CO2 Ultimate Reduction in Steelmaking Process by Innovative Technology for Cool Earth 50

Pilot and Demonstration CCS Facility

Operational

Japan

2008

Iron and Steel Production

EAGLE

Pilot and Demonstration CCS Facility

Completed

Japan

2002

Power Generation

Kashiwazaki Clean Hydrogen/ Ammonia Project

Pilot and Demonstration CCS Facility

In Construction

Japan

2024

Hydrogen Production

Mikawa Post Combustion Capture Demonstration Plant

Pilot and Demonstration CCS Facility

Operational

Japan

2020

Power Generation

Nagaoka CO2 Storage Project

Pilot and Demonstration CCS Facility

Completed

Japan

2003

Natural Gas Processing

Osaki CoolGen Project

Pilot and Demonstration CCS Facility

In Construction

Japan

2020

Power Generation

Taiheiyo Cement Corporation

Pilot and Demonstration CCS Facility

Operational

Japan

2021

Cement Production

Tomakomai CCS Demonstration Project

Pilot and Demonstration CCS Facility

Operational

Japan

2016

Hydrogen Production

Kasawari

Commercial CCS Facility

In Construction

Malaysia

2025

Natural Gas Processing

Lang Lebah CCS

Commercial CCS Facility

Advanced Development

Malaysia

2026

Natural Gas Processing

Air Liquide Refinery Rotterdam CCS

Commercial CCS Facility

Advanced Development

Netherlands

2024

Hydrogen Production

Air Products Refinery Rotterdam CCS

Commercial CCS Facility

Advanced Development

Netherlands

2024

Hydrogen Production

Buggenum Carbon Capture (CO2 Catch-up) Pilot Project

Pilot and Demonstration CCS Facility

Completed

Netherlands

2011

Power Generation

Delta Corridor Pipeline Network

Commercial CCS Facility

Early Development

Netherlands

2026

CO2 Transport and Storage

ExxonMobil Benelux Refinery CCS

Commercial CCS Facility

Advanced Development

Netherlands

2024

Hydrogen Production

Hydrogen 2 Magnum (H2M)

Commercial CCS Facility

Early Development

Netherlands

2024

Power Generation

K12-B CO2 Injection Project

Pilot and Demonstration CCS Facility

Completed

Netherlands

2004

Natural Gas Processing

L10 Carbon Capture and Storage

Commercial CCS Facility

Early Development

Netherlands

2026

Hydrogen Production

Porthos—Compressor Station

Commercial CCS Facility

Advanced Development

Netherlands

2024

CO2 Transport and Storage

Porthos—Offshore Pipeline

Commercial CCS Facility

Advanced Development

Netherlands

2024

CO2 Transport and Storage

Porthos—Onshore Pipeline

Commercial CCS Facility

Advanced Development

Netherlands

2024

CO2 Transport and Storage

Porthos Storage

Commercial CCS Facility

Advanced Development

Netherlands

2024

CO2 Transport and Storage

Shell Energy and Chemicals Park Rotterdam

Commercial CCS Facility

In Construction

Netherlands

2024

Bioenergy

Yara Sluiskil

Commercial CCS Facility

Early Development

Netherlands

2025

Fertiliser Production

Zeeland Refinery Azur

Commercial CCS Facility

Early Development

Netherlands

2026

Hydrogen Production

Project Pouakai Hydrogen Production with CCS

Commercial CCS Facility

Early Development

New Zealand

2024

Hydrogen Production

Barents Blue

Commercial CCS Facility

Early Development

Norway

2025

Fertiliser Production

Borg CO2

Commercial CCS Facility

Early Development

Norway

CO2 Transport and Storage

CEMCAP

Pilot and Demonstration CCS Facility

Completed

Norway

2015

Cement Production

CO2 Capture Test Facility at Norcem Brevik

Pilot and Demonstration CCS Facility

Completed

Norway

2013

Cement Production

Equinor Smeaheia (Norway)

Commercial CCS Facility

Early Development

Norway

2028

CO2 Storage

Fortum Oslo Varme—Shipping Route

Commercial CCS Facility

Early Development

Norway

2025

Waste Incineration

Hafslund Oslo Celsio

Commercial CCS Facility

In Construction

Norway

2024

Waste Incineration

Hafslund Oslo Celsio—Truck Route

Commercial CCS Facility

Advanced Development

Norway

2025

Waste Incineration

Norcem Brevik—Cement Plant

Commercial CCS Facility

In Construction

Norway

2024

Cement Production

Norcem Brevik—Shipping Route

Commercial CCS Facility

In Construction

Norway

2024

Cement Production

Northern Lights—Pipeline

Commercial CCS Facility

Early Development

Norway

2024

CO2 Transport and Storage

Northern Lights—Storage

Commercial CCS Facility

In Construction

Norway

2024

CO2 Transport and Storage

Polaris Carbon Storage

Commercial CCS Facility

Advanced Development

Norway

2024

Hydrogen Production

Sleipner CCS Project

Commercial CCS Facility

Operational

Norway

1996

Natural Gas Processing

Snohvit CO2 Storage

Commercial CCS Facility

Operational

Norway

2008

Natural Gas Processing

Technology Centre Mongstad (TCM)

Pilot and Demonstration CCS Facility

Operational

Norway

2012

Oil Refining

Project Hajar

Commercial CCS Facility

In Construction

Oman

2024

Direct Air Capture

Papua LNG CCS

Commercial CCS Facility

Early Development

Papua New Guinea

2027

Natural Gas Processing

GO4ECOPLANET

Commercial CCS Facility

Early Development

Poland

2027

Cement Production

North Field East Project (NFE) CCS

Commercial CCS Facility

In Construction

Qatar

2025

Natural Gas Processing

Qatar LNG CCS

Commercial CCS Facility

Operational

Qatar

2019

Natural Gas Processing

Novatek Yamal LNG CCS

Commercial CCS Facility

Early Development

Russia

2027

Natural Gas Processing

Uthmaniyah CO2-EOR Demonstration

Commercial CCS Facility

Operational

Saudi Arabia

2015

Natural Gas Processing

Pilot Carbon Storage Project (PCSP)—Zululand Basin, South Africa

Pilot and Demonstration CCS Facility

Advanced Development

South Africa

2020

Under Evaluation

Boryeong—KoSol Process for CO2 Capture (KPCC) Test

Pilot and Demonstration CCS Facility

Completed

South Korea

2010

Power Generation

Hadong—Dry-sorbent CO2 Capture System Test

Pilot and Demonstration CCS Facility

Completed

South Korea

2014

Power Generation

Korea-CCS 1 & 2

Commercial CCS Facility

Early Development

South Korea

2025

Power Generation

CIUDEN: CO2 Capture & Transport Technology Development Plant

Pilot and Demonstration CCS Facility

Completed

Spain

2012

Power Generation

CIUDEN: CO2 Storage Technology Development Plant

Pilot and Demonstration CCS Facility

Operational

Spain

2015

Research and Development

ELCOGAS Pre-combustion Carbon Capture Pilot Project: Puertollano

Pilot and Demonstration CCS Facility

Completed

Spain

2010

Power Generation

La Pereda Calcium Looping Pilot Plant

Pilot and Demonstration CCS Facility

Completed

Spain

2012

Power Generation

Cementa CCS (Slite Cement plant)

Commercial CCS Facility

Early Development

Sweden

2030

Cement Production

Cinfracap—Pipeline

Commercial CCS Facility

Early Development

Sweden

2026

CO2 Transport and Storage

Cinfracap—Shipping Route

Commercial CCS Facility

Early Development

Sweden

2026

CO2 Transport and Storage

Karlshamn Field Pilot

Pilot and Demonstration CCS Facility

Completed

Sweden

2009

Power Generation

Preem Refinery CCS

Commercial CCS Facility

Early Development

Sweden

2025

Hydrogen Production

STEPWISE Pilot of SEWGS Technology at Swerea/Mefos

Pilot and Demonstration CCS Facility

Operational

Sweden

2017

Iron and Steel Production

Stockholm Exergi BECCS

Commercial CCS Facility

Advanced Development

Sweden

2027

Bioenergy

Stockholm Exergi BECCS— Shipping Route

Commercial CCS Facility

Advanced Development

Sweden

2027

Bioenergy

PTTEP Arthit CCS

Commercial CCS Facility

Advanced Development

Thailand

TBC

Natural Gas Processing

Bayu-Undan CCS

Commercial CCS Facility

Advanced Development

Timor-Leste

2027

Natural Gas Processing

Abu Dhabi CCS (Phase 1 being Emirates Steel Industries)

Commercial CCS Facility

Operational

United Arab Emirates

2016

Iron and Steel Production

Abu Dhabi CCS Phase 2: Natural gas processing plant

Commercial CCS Facility

Advanced Development

United Arab Emirates

2025

Natural Gas Processing

Ghasha Concession Fields

Commercial CCS Facility

Advanced Development

United Arab Emirates

2025

Natural Gas Processing

Aberthaw Pilot Carbon Capture Facility

Pilot and Demonstration CCS Facility

Completed

United Kingdom

2013

Power Generation

Acorn

Commercial CCS Facility

Early Development

United Kingdom

2024

Hydrogen Production

Acorn (Minimum Viable CCS Development)

Pilot and Demonstration CCS Facility

Advanced Development

United Kingdom

2025

CO2 Transport and Storage

Acorn CO2 Pipeline

Commercial CCS Facility

Early Development

United Kingdom

2026

CO2 Transport and Storage

Acorn Direct Air Capture Facility

Commercial CCS Facility

Early Development

United Kingdom

2026

Hydrogen Production

Acorn Hydrogen

Commercial CCS Facility

Early Development

United Kingdom

2025

Hydrogen Production

Acorn Storage Site

Commercial CCS Facility

Advanced Development

United Kingdom

2025

CO2 Transport and Storage

Buxton Lime Net Zero

Commercial CCS Facility

Early Development

United Kingdom

2024

Lime Production

Caledonia Clean Energy

Commercial CCS Facility

Early Development

United Kingdom

2025

Power Generation

CF Fertilisers Billingham Ammonia CCS

Commercial CCS Facility

Early Development

United Kingdom

2023

Fertiliser Production

Damhead Pipeline (Medway Hub)

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

Damhead Power Station (Medway)

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

Drax BECCS Project

Commercial CCS Facility

Early Development

United Kingdom

2027

Power Generation

Drax bioenergy carbon capture pilot plant

Pilot and Demonstration CCS Facility

Operational

United Kingdom

2019

Power Generation

East Coast Cluster Humber Pipeline

Commercial CCS Facility

Advanced Development

United Kingdom

2025

CO2 Transport and Storage

East Coast Cluster Teesside Pipeline

Commercial CCS Facility

Advanced Development

United Kingdom

2025

CO2 Transport and Storage

Endurance Storage Site

Commercial CCS Facility

Advanced Development

United Kingdom

2025

CO2 Transport and Storage

Esmond and Forbes Carbon Storage (Medway Hub)

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

Ferrybridge Carbon Capture Pilot (CCPilot100+)

Pilot and Demonstration CCS Facility

Completed

United Kingdom

2011

Power Generation

Grain Power Station (Medway)

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

H2NorthEast

Commercial CCS Facility

Early Development

United Kingdom

2027

Hydrogen Production

Hydrogen to Humber Saltend

Commercial CCS Facility

Early Development

United Kingdom

2025

Hydrogen Production

HyNet Hydrogen Production Project (HPP)

Commercial CCS Facility

Early Development

United Kingdom

2025

Hydrogen Production

HyNet North West

Commercial CCS Facility

Early Development

United Kingdom

2026

Hydrogen Production

HyNet North West—Hanson Cement CCS

Commercial CCS Facility

Early Development

United Kingdom

2026

Cement Production

HyNet Pipeline

Commercial CCS Facility

Early Development

United Kingdom

2025

CO2 Transport and Storage

Hynet Storage Site

Commercial CCS Facility

Early Development

United Kingdom

2025

CO2 Transport and Storage

Isle of Grain LNG Terminal (Medway Hub)

Commercial CCS Facility

Early Development

United Kingdom

2026

Power Generation

Keady 3 CCS Power Station

Commercial CCS Facility

Early Development

United Kingdom

2027

Power Generation

Killingholme Power Station

Commercial CCS Facility

Early Development

United Kingdom

2027

Hydrogen Production

Medway Hub Shipping

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

Medway Power Station

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

NET Power Plant (East Coast Cluster)

Commercial CCS Facility

Early Development

United Kingdom

2025

Power Generation

Net Zero Teesside—CCGT Facility

Commercial CCS Facility

Early Development

United Kingdom

2025

Power Generation

Net Zero Teesside—BP H2Teesside

Commercial CCS Facility

Early Development

United Kingdom

2027

Hydrogen Production

Northern Gas Network H21 North of England

Commercial CCS Facility

Early Development

United Kingdom

2026

Hydrogen Production

Pembroke Power Station

Commercial CCS Facility

Early Development

United Kingdom

2030

Power Generation

Peterhead CCS Power Station

Commercial CCS Facility

Advanced Development

United Kingdom

2026

Power Generation

Phillips 66 Humber Refinery CCS

Commercial CCS Facility

Advanced Development

United Kingdom

2028

Hydrogen Production

Prax Lindsey Carbon Capture Project (PLCCP)

Commercial CCS Facility

Advanced Development

United Kingdom

2028

Oil Refining

Redcar Energy Centre

Commercial CCS Facility

Early Development

United Kingdom

2025

Power Generation

Renfrew Oxy-fuel (Oxycoal 2) Project

Pilot and Demonstration CCS Facility

Completed

United Kingdom

2007

Power Generation

Suez Waste to Energy CCS (East Coast Cluster)

Commercial CCS Facility

Early Development

United Kingdom

2027

Waste Incineration

Tees Valley Energy Recovery Facility Project (TVERF)

Commercial CCS Facility

Early Development

United Kingdom

2026

Bioenergy

UKCCSRC Pilot-scale Advanced Capture Technology (PACT)

Pilot and Demonstration CCS Facility

Completed

United Kingdom

2012

Power Generation

Vertex Hydrogen

Commercial CCS Facility

Early Development

United Kingdom

2025

Oil Refining

Viking CCS Pipeline

Commercial CCS Facility

Advanced Development

United Kingdom

2027

CO2 Transport and Storage

Viking CCS Storage Site

Commercial CCS Facility

Advanced Development

United Kingdom

2027

CO2 Transport and Storage

Viridor Runcorn Carbon Capture

Commercial CCS Facility

Early Development

United Kingdom

Waste Incineration

VPI Immingham Power Plant CCS

Commercial CCS Facility

Advanced Development

United Kingdom

2027

Power Generation

Whitetail Clean Energy

Commercial CCS Facility

Early Development

United Kingdom

Power Generation

ADM Illinois Industrial

Commercial CCS Facility

Operational

USA

2017

Ethanol Production

ArcelorMittal Texas (formerly voestalpine Texas)

Commercial CCS Facility

Early Development

USA

Iron and Steel Production

Arkalon CO2 Compression Facility

Commercial CCS Facility

Operational

USA

2009

Ethanol Production

Ascension Clean Energy (Louisiana)

Commercial CCS Facility

Early Development

USA

2027

Hydrogen Production

Atkinson Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Bayou Bend CCS

Commercial CCS Facility

Advanced Development

USA

2025

CO2 Transport and Storage

Baytown Low Carbon Hydrogen

Commercial CCS Facility

Advanced Development

USA

2027

Hydrogen Production

Bell Creek—Incidental CO2 Storage Associated with a Commercial EOR Project

Pilot and Demonstration CCS Facility

Operational

USA

2010

Natural Gas Processing

Bonanza BioEnergy CCUS EOR

Commercial CCS Facility

Operational

USA

2012

Ethanol Production

Borger CO2 Compression Facility

Commercial CCS Facility

Completed

USA

2001

Fertiliser Production

Bushmills Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Cal Capture

Commercial CCS Facility

Advanced Development

USA

2027-28

Power Generation

Cane Run CCS

Commercial CCS Facility

Early Development

USA

Power Generation

Carbon TerraVault I Project

Commercial CCS Facility

Early Development

USA

2025

CO2 Transport and Storage

CarbonFree Skymine

Utilisation Facilities

Operational

USA

2015

Cement Production

Casselton Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Central City Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Central Louisiana Regional Carbon Storage (CENLA) Hub

Commercial CCS Facility

In Construction

USA

2027

CO2 Transport and Storage

Century Plant

Commercial CCS Facility

Operational

USA

2010

Natural Gas Processing

Clean Energy Systems BiCRS Plant—Madera County

Commercial CCS Facility

Early Development

USA

2027

Power Generation

Clean Energy Systems Carbon Negative Energy Plant—Central Valley

Commercial CCS Facility

Early Development

USA

2025

Power Generation

CO2 Sequestration Field Test: Deep Unminable Lignite Seam

Pilot and Demonstration CCS Facility

Completed

USA

2009

Research and Development

Coastal Bend CCS

Commercial CCS Facility

Early Development

USA

2026

CO2 Transport and Storage

Coffeyville Gasification Plant

Commercial CCS Facility

Operational

USA

2013

Fertiliser Production

Core Energy CO2-EOR

Commercial CCS Facility

Operational

USA

2003

Natural Gas Processing

Coyote Clean Power Project

Commercial CCS Facility

Advanced Development

USA

2025

Power Generation

CPV Shay Energy Center (CPV West Virginia Natural Gas Power Station CCS)

Commercial CCS Facility

Early Development

USA

Power Generation

Cranfield Project

Pilot and Demonstration CCS Facility

Operational

USA

2009

Research and Development

Cyclus Power Generation

Commercial CCS Facility

Early Development

USA

Bioenergy

Dave Johnston Plant Carbon Capture

Commercial CCS Facility

Early Development

USA

2025

Power Generation

Deer Park Energy Centre CCS Project

Commercial CCS Facility

Advanced Development

USA

Power Generation

Diamond Vault CCS

Commercial CCS Facility

Early Development

USA

2028

Power Generation

Donaldsonville

Commercial CCS Facility

In Construction

USA

2025

Ammonia Production

Dry Fork Integrated Commercial Carbon Capture and Storage (CCS)

Commercial CCS Facility

Early Development

USA

2025

Power Generation

E.W. Brown 0.7 MWe Pilot Carbon Capture Unit

Pilot and Demonstration CCS Facility

Operational

USA

2014

Power Generation

El Dorado CCS Project

Commercial CCS Facility

Early Development

USA

2026

Fertiliser Production

Enid Fertilizer

Commercial CCS Facility

Operational

USA

1982

Fertiliser Production

Fairmont Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Farley DAC Project

Commercial CCS Facility

Advanced Development

USA

Direct Air Capture

Farnsworth Unit EOR Field Project—Development Phase

Pilot and Demonstration CCS Facility

Operational

USA

2013

Ethanol Production

Freeport LNG CCS project

Commercial CCS Facility

Cancelled

USA

2024

Natural Gas Processing

Frio Brine Pilot

Pilot and Demonstration CCS Facility

Completed

USA

2004

Research and Development

Fuel Cell Carbon Capture Pilot Plant

Pilot and Demonstration CCS Facility

Operational

USA

2016

Power Generation

G2 Net-Zero LNG

Commercial CCS Facility

Early Development

USA

Natural Gas Processing

Galva Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Gerald Gentleman Station Carbon Capture

Commercial CCS Facility

Advanced Development

USA

2025

Power Generation

Goldfield Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Grand Forks Blue Ammonia Capture plant

Commercial CCS Facility

Early Development

USA

Natural Gas Processing

Grand Junction Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Granite Falls Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Great Plains Synfuels Plant and Weyburn-Midale

Commercial CCS Facility

Operational

USA

2000

Hydrogen Production

Hackberry Carbon Sequestration Project (Sempra)

Commercial CCS Facility

Early Development

USA

CO2 Transport and Storage

Haynesville Gas Processing (CENLA Hub)

Commercial CCS Facility

In Construction

USA

2027

Natural Gas Processing

Heartland Greenway Storage

Commercial CCS Facility

Early Development

USA

2025

Ethanol Production

Heartland Hydrogen Hub

Commercial CCS Facility

Advanced Development

USA

Power Generation

HeidelbergCement CCS

Commercial CCS Facility

Advanced Development

USA

2023

Cement Production

Heron Lake Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Huron Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Illinois Allam-Fetvedt cycle power plant

Commercial CCS Facility

Early Development

USA

2025

Power Generation

Illinois Basin Decatur Project (CO2 Injection Completed, Monitoring Ongoing)

Pilot and Demonstration CCS Facility

Completed

USA

2011

Ethanol Production

James M. Barry Electric Generating Plant CCS Project

Commercial CCS Facility

Advanced Development

USA

2030

Power Generation

Kevin Dome Carbon Storage Project—Development Phase

Pilot and Demonstration CCS Facility

Completed

USA

2013

Research and Development

LafargeHolcim Cement Carbon capture

Commercial CCS Facility

Early Development

USA

2025

Cement Production

LafargeHolcim Ste. Genevieve Cement Plant CCS

Commercial CCS Facility

Early Development

USA

Cement Production

Lake Charles Methanol

Commercial CCS Facility

Advanced Development

USA

2025

Chemical Production

Lamberton Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Lawler Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Linde hydrogen plant for OCI fertilizer blue ammonia Beaumont

Commercial CCS Facility

In Construction

USA

2025

Hydrogen Production

Lone Cypress Hydrogen Project

Commercial CCS Facility

Early Development

USA

2025

Hydrogen Production

Lost Cabin Gas Plant

Commercial CCS Facility

Operational

USA

2013

Natural Gas Processing

Louisiana Clean Energy Complex

Commercial CCS Facility

In Construction

USA

2025

Hydrogen Production

Marcus Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Marshall County ECBM Project

Pilot and Demonstration CCS Facility

Completed

USA

2009

Research and Development

Mason City Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Mendota BECCS

Commercial CCS Facility

Early Development

USA

2025

Bioenergy

Merrill Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

MGSC Validation Phase (Phase II): CO2 Storage and Enhanced Oil Recovery: Bald Unit Oil Field Test Site

Pilot and Demonstration CCS Facility

Completed

USA

2009

Research and Development

MGSC Validation Phase (Phase II): CO2 Storage and Enhanced Oil Recovery: Sugar Creek Oil Field Test Site

Pilot and Demonstration CCS Facility

Completed

USA

2009

Research and Development

Michigan Basin (Phase II) Geologic CO2 Sequestration Field Test

Pilot and Demonstration CCS Facility

Completed

USA

2008

Natural Gas Processing

Michigan Basin Large-Scale Injection Test

Pilot and Demonstration CCS Facility

Operational

USA

2013

Natural Gas Processing

Midwest AgEnergy Blue Flint ethanol CCS

Commercial CCS Facility

Early Development

USA

2022

Ethanol Production

Mina Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Mountaineer Validation Facility

Pilot and Demonstration CCS Facility

Completed

USA

2009

Power Generation

Mt. Simon CCS Hub (Iowa Illinois Carbon Pipeline)

Commercial CCS Facility

Early Development

USA

CO2 Transport and Storage

Mustang Station of Golden Spread Electric Cooperative Carbon Capture

Commercial CCS Facility

Advanced Development

USA

Power Generation

National Carbon Capture Center (NCCC)

Pilot and Demonstration CCS Facility

Operational

USA

2011

Research and Development

NET Power Clean Energy Large-scale Pilot Plant

Pilot and Demonstration CCS Facility

Operational

USA

2018

Power Generation

Nevada Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

NextDecade Rio Grande LNG CCS

Commercial CCS Facility

Early Development

USA

2025

Natural Gas Processing

Norfolk Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Northern Delaware Basin CCS

Commercial CCS Facility

Advanced Development

USA

2023

Natural Gas Processing

NuDACCS—Nuclear Direct Air CCS Project

Pilot and Demonstration CCS Facility

Advanced Development

USA

Direct Air Capture

OCI Fertiliser

Commercial CCS Facility

In Construction

USA

2025

Fertiliser Production

One Earth Energy facility Carbon Capture

Commercial CCS Facility

Advanced Development

USA

2025

Ethanol Production

Onida Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Otter Tail Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Oxy-combustion of Heavy Liquid Fuels—15 MW Pilot Test

Pilot and Demonstration CCS Facility

Completed

USA

2012

Power Generation

PCS Nitrogen

Commercial CCS Facility

Operational

USA

2013

Fertiliser Production

Petra Nova Carbon Capture Project

Commercial CCS Facility

Operational

USA

2017

Power Generation

Plainview Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Plant Barry & Citronelle Integrated Project

Pilot and Demonstration CCS Facility

Completed

USA

2012

Power Generation

Plant Daniel Carbon Capture

Commercial CCS Facility

Advanced Development

USA

Power Generation

Pleasant Prairie Power Plant Field Pilot

Pilot and Demonstration CCS Facility

Completed

USA

2008

Power Generation

Polk Power Station CCS

Commercial CCS Facility

Advanced Development

USA

Under Evaluation

Power Generation

Prairie State Generating Station Carbon Capture

Commercial CCS Facility

Advanced Development

USA

2025

Power Generation

Project Interseqt—Hereford Ethanol Plant

Commercial CCS Facility

Early Development

USA

2023

Ethanol Production

Project Interseqt—Plainview Ethanol Plant

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Project Tundra

Commercial CCS Facility

Advanced Development

USA

2026

Power Generation

Red Trail Energy CCS

Commercial CCS Facility

Operational

USA

2022

Ethanol Production

Redfield Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

River Bend CCS Louisiana Pipeline

Commercial CCS Facility

Early Development

USA

2026

CO2 Transport and Storage

San Juan Basin ECBM Storage Test

Pilot and Demonstration CCS Facility

Completed

USA

2008

Research and Development

Shenandoah Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Shute Creek Gas Processing Plant

Commercial CCS Facility

Operational

USA

1986

Natural Gas Processing

Sioux Center Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Steamboat Rock Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

STRATOS (1PointFive Direct Air Capture)

Commercial CCS Facility

In Construction

USA

2024

Direct Air Capture

Summit Carbon Solutions— Storage

Commercial CCS Facility

Advanced Development

USA

2024

CO2 Transport and Storage

Summit Pipeline

Commercial CCS Facility

Advanced Development

USA

2024

Bioenergy

Superior Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Terrell Natural Gas Processing Plant (formerly Val Verde Natural Gas Plants)

Commercial CCS Facility

Operational

USA

1972

Natural Gas Processing

The Illinois Clean Fuels Project

Commercial CCS Facility

Early Development

USA

2025

Chemical Production

Valero Port Arthur Refinery

Commercial CCS Facility

Operational

USA

2013

Hydrogen Production

Velocys’ Bayou Fuels Negative Emission Project

Commercial CCS Facility

Early Development

USA

2026

Chemical Production

Wabash CO2 Sequestration

Commercial CCS Facility

Advanced Development

USA

2022

Fertiliser Production

Watertown Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Wentworth Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

West Pearl Queen CO2 Sequestration Pilot Test and Modelling Project

Pilot and Demonstration CCS Facility

Completed

USA

2002

Research and Development

Wood River Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production

Wyoming Integrated Test Center (ITC)

Pilot and Demonstration CCS Facility

Operational

USA

2018

Power Generation

York Biorefinery Carbon Capture and Storage

Commercial CCS Facility

Advanced Development

USA

2024

Ethanol Production