Borehole No

Depth (m)

Yield (m3/day)

T (m2/day)

S

Method

BH 1 (Piezometer)

7.0

223

Jacob’s

Pumping BH 2

8.0

432

292

BH 3 (Piezometer)

7.0

283

9.8 × 10−4