Borehole No | Depth (m) | Yield (m3/day) | T (m2/day) | S | Method |
BH 1 (Piezometer) | 7.0 |
| 223 |
| Jacob’s |
Pumping BH 2 | 8.0 | 432 | 292 |
| |
BH 3 (Piezometer) | 7.0 |
| 283 | 9.8 × 10−4 |