| S/N |
Control measures |
Frequency |
% |
| 1 |
Construction of more Drainage |
12 |
16 |
| 2 |
Early monitoring and warning |
11 |
14.7 |
| 3 |
Widening of existing drainage channels |
8 |
10.6 |
| 4 |
Enactment of policies that restrict dumping of waste in drainage channels |
6 |
8.0 |
| 5 |
Avoidance of construction on flood plains |
5 |
6.7 |
| 6 |
All of the above |
33 |
44.0 |
|
|
Total |
75 |
100 |