Estimated Constructions | Constructions Data and Estimations | ||||
TEA (m2) | Reference Group Most Similar Cost (AEAC) (INCC/m2) | Estimated TCC (INCC) | Total Cost Incurred (INCC) | Estimation Deviation (%) | |
1 | 13.09801 | 2.93 | 38.43746 | 39.88254 | −3.8% |
2 | 36.56048 | 2.86 | 104.38807 | 137.78187 | −32.0% |
3 | 11.20166 | 3.23 | 36.21408 | 37.77413 | −4.3% |
4 | 17.21079 | 3.13 | 53.81952 | 55.24855 | −2.7% |
5 | 3.88490 | 3.83 | 14.87726 | 15.01165 | −0.9% |