Estimated Constructions | Constructions Data and Estimations | ||||
TEA (m2) | Reference Group Average Cost (AEAC) (INCC/m2) | Estimated TCC (INCC) | Total Cost Incurred (INCC) | Estimation Deviation (%) | |
1 | 13.09801 | 2.78 | 36.39547 | 39.88254 | −9.6% |
2 | 36.56048 | 2.89 | 105.56276 | 137.78187 | −30.5% |
3 | 11.20166 | 3.06 | 34.32533 | 37.77413 | −10.0% |
4 | 17.21079 | 3.07 | 52.80905 | 55.24855 | −4.6% |