Estimated

Constructions

Estimated Constructions Data

EAC (INCC)

ADMC (INCC)

EXC (INCC)

Estimated (TCC)

Total Cost Incurred (INCC)

Error of the Estimation (%)

1

33.59206

4.50000

1.17500

39.26706

39.88254

−1.57%

2

100.51983

12.24000

24.19000

136.94983

137.78187

−0.61%

3

32.44961

4.32000

0.82000

37.58961

37.77413

−0.49%

4

49.46099

4.76000

1.35500

55.57599

55.24855

0.59%

5

12.66566

1.68000

0.73500

15.08066

15.01165

0.46%