Well number | Erosion velocity | Critical liquid-carrying capacity | Reasonable production | Maximum production capacity | Conventional peak shaving capacity | Emergency peak shaving capability |
A1 | 80 | 5.85 | 8.5 | 24.78 | 2.65 | 16.28 |
A2 | 75 | 4.74 | 4.74 | 7.11 | 0 | 2.37 |
A3 | 65 | 8.65 | 8.65 | 28.19 | 0 | 19.54 |
A4 | 89 | 4.81 | 4.81 | 7.72 | 0 | 2.91 |
A5 | 78 | 5.51 | 2.34 | 2.39 | 0 | 0.05 |
A6 | 67 | 7.56 | 12.58 | 14.3 | 5.02 | 1.72 |
A7 | 79 | 7.73 | 18.58 | 72.48 | 10.85 | 53.9 |
A8 | 74 | 7.56 | 24.68 | 66.78 | 17.12 | 42.1 |
A9 | 65 | 3.87 | 15.65 | 27.06 | 11.78 | 11.41 |