Well number

Qmax

104 m3/d

Erosion elocity

104 m3/d

Critical liquid carrying capacity

104 m3/d

Allocation coefficient

Yield distribution

104 m3/d

Shut in time

d

Monthly cumulative production

104 m3

H2

35.50

37.75

5.78

0.74

26.38

5.00

672.66

H3

29.70

35.41

5.44

0.81

24.16

5.00

616.10

H5

36.10

35.41

5.44

0.84

30.47

5.00

776.99

H6

33.70

37.75

5.78

0.75

25.27

0.00

770.79

H1

32.16

34.93

5.38

0.81

26.12

5.00

666.06

M2

19.20

46.31

6.96

0.53

10.25

0.00

312.63

M3

73.60

82.87

8.85

0.60

44.47

5.00

1133.96

M4

52.80

76.18

8.18

0.39

20.70

0.00

631.35

M1

94.00

75.11

8.08

0.72

67.26

5.00

1715.07

P1

13.30

38.63

5.84

0.58

7.69

6.00

188.31

P2

5.92

34.41

5.20

0.41

2.40

0.00

73.25

P3

22.90

34.71

5.25

0.21

4.71

0.00

143.60

P7

18.50

34.64

5.24

0.58

10.72

6.00

262.65

P9

2.94

27.43

4.13

0.48

1.40

0.00

42.69

P6

28.18

32.99

4.99

0.58

16.25

6.00

398.20

P5

18.60

34.17

5.17

0.72

13.44

6.00

329.37

D1

25.90

45.63

6.97

0.35

9.07

5.00

231.31

D4

12.20

46.55

7.11

0.55

6.67

5.00

170.14

D5

12.40

50.96

7.75

0.73

9.07

5.00

231.35

D6

24.11

57.64

8.68

0.42

10.04

5.00

256.08

D3

5.45

45.63

6.97

0.46

2.53

5.00

64.54

D7

18.10

62.54

9.31

0.15

2.68

5.00

68.45

D8

22.00

64.95

9.96

0.50

10.97

5.00

279.73

Sum.

10,035.28