| DOD = 0.8 | DOD = 0.7 | DOD = 0.6 | DOD = 0.5 |
NPV NWT PPV PWT EESS Total Cost | 164 5 41.8 kW 7.5 kW 200 kWh $255012.00 | 166 5 42.3 kW 7.5kW 200 kWh $255828.07 | 168 5 42.8 kW 7.5 kW 200 kWh $256644.00 | 176 5 44.9 kW 7.5 kW 200 kWh $259908.00 |