| Process | Defects | MTTF (Weeks) | ||||
| Actual | Pred. | Error % | Actual | Pred. | Error % | |
| SF | 17 | 17 | 0 | 0.8824 | 0.8824 | 0 |
| SL | 36 | 27 | −25 | 0.4167 | 0.5556 | 33.3333 |
| Other | 12 | 21 | 75 | 1.2500 | 0.7143 | −42.8571 |
| Total | 65 | 65 | 0 | 0.2308 | 0.2308 | 0 |