Measured silting data
Rusle3D
Uspeda
Nekor basin
1.13 × 106 (t∙year−1)
4.8 × 106 (t∙year−1)
5.1 × 106 (t∙year−1)
Sediment Delivery Ratio
-
23 (%)
22 (%)