mining plan

Subsidence value (mm)

Tilt (mm/m)

Level move

(mm)

Level Deformation (mm/m)

curvature

(10−3/m)

Option I

1506.9

24.9

583.7

+12

−21.9

<0.05

Option II

3480.3

51.2

1273.2

+24.3

−33.8

<0.05