Project | Specificity | Contractor |
Lobito-Luau railway in Angola | 1344-km; fastest traveling speed in Angola | China Railway Construction Corporation Limited |
Addis Ababa Light Rail Transit (AA-LRT) in Ethiopia | 34 km; first light railway in Africa | China Railway Group Limited |
Kigamboni Bridge in Tanzania | 680-meter-long bridge, 32 meters wide ($135 million) | China Railway Construction Engineering Group and China Railway Major Bridge Group |
Abuja-Kaduna railway in Nigeria | 186.5 km; linking Abuja (the capital city) and Kaduna (northwestern state) | China Civil Engineering Construction Corporation |
Ethio-Djibouti railway | 752.7-km; linking Addis Ababa (Ethiopian capital) and the port of Djibouti; first modern electrified railway of Africa ($4 billion) | China Railway Group Limited and China Civil Engineering Construction Corporation |
Tanzania-Zambia railway | 1860-km; revitalizing the China-Africa friendship’s monument built in the 1970s; longest railway in sub-Saharan Africa | China Railway Construction Corporation |
Pointe Noire special economic zone | China-Africa production capacity cooperation and a model project for Africa’s intensive development. | NA |
Garissa power plant | 50-megawatt PV power plant; largest PV power plant in East Africa; financed by the Export-Import Bank of China ($135 million) | China’s Jiangxi Corporation for International Economic and Technical Cooperation (CJIC) |