Location | Physicochemical parameters | ||||
DO (mg/L)a | pHb | TDS (mg/L)c | Temp (˚C)d | Turbidity (cm)e | |
Cerro Alto | 8.4 ± 4.3 | 7.9 ± 0.4 | 434 ± 120 | 26.2 ± 1.4 | 76.1 ± 36.2 |
Margara Creek | 8.7 ± 3.9 | 8.1 ± 0.6 | 212 ± 104 | 27.8 ± 1.4 | 62.8 ± 22.5 |
Margara Canal | 8.6 ± 3.7 | 7.8 ± 0.4 | 229 ± 70 | 25.2 ± 1.5 | 95.1 ± 13.0 |
UPR Agricultural Experimental Substation Drainage Canal | 7.2 ± 5.2 | 7.7 ± 0.6 | 269 ± 75 | 25.7 ± 2.5 | 12.1 ± 13.9 |
Principal Drainage Canal (Combined Inlet) | 1.8 ± 1.3 | 7.2 ± 0.3 | 255 ± 65 | 26.5 ± 1.9 | 69.2 ± 27.2 |