Basin

Area (km2)

Longest flow path (m)

CN

Slope %

Runoff depth (mm)

Runoff volume (million m3)

Time of concentration Tc (h)

B1

555.47

77,410.48

88.8

5.63

75.8

42.553

13.80

B2

143.28

32,825.69

91.4

5.25

82.5

11.452

6.46

B3

192.27

42,556.96

90.3

4.60

80.3

14.382

8.91

B4

448.60

62,297.97

90.7

5.83

80.8

36.001

10.54

B5

59.04

12,715.07

88.7

1.37

75.5

4.501

6.60

B6

201.10

35,140.56

90.5

7.62

80.4

16.458

5.87

B7

84.79

19,882.92

87.5

3.22

72.7

6.224

6.46

B8

14.61

10,231.69

93.6

2.11

88.1

1.287

3.62

B9

9.40

7486.95

93.6

2.14

88.0

0.827

2.81

B10

6.98

9332.22

93.5

2.12

87.8

0.613

3.38

B11

15.47

9040.97

91.2

1.64

81.8

1.265

4.14

B12

11.21

8113.69

91.5

1.43

82.3

0.923

4.04

Total volume

136.486