Concrete composition after adjustment to m3

Concrete components

Percentage

Volume

ρr

Quantity

45 liters

(%)

l

kg/l

kg/m3

kg

Basalt 8/16

58.0

392.0

2.976

1167.0

52.52

Basalt 3/8

8.0

54.0

2.978

161.0

7.25

50% dune sand + 50% basalt 0/3

34.0

230.0

2.765

636.0

28.61

Cement CEM II B-M 42.5

-

113.0

3.1

350.0

15.75

Water (tap water)

-

211.0

1.0

211.0

9.50

Total

100

1000.0

-

2525.0

113.62