| Concrete composition after adjustment to m3 |
|||||
| Concrete components |
Percentage |
Volume |
ρr |
Quantity |
45 liters |
| (%) |
l |
kg/l |
kg/m3 |
kg |
|
| Basalt 8/16 |
58.0 |
392.0 |
2.976 |
1167.0 |
52.52 |
| Basalt 3/8 |
8.0 |
54.0 |
2.978 |
161.0 |
7.25 |
| 50% dune sand + 50% basalt 0/3 |
34.0 |
230.0 |
2.765 |
636.0 |
28.61 |
| Cement CEM II B-M 42.5 |
- |
113.0 |
3.1 |
350.0 |
15.75 |
| Water (tap water) |
- |
211.0 |
1.0 |
211.0 |
9.50 |
| Total |
100 |
1000.0 |
- |
2525.0 |
113.62 |