Long-run Estimated Model: | |||||||
LIMP = 1.000 LIMPORT−1 | −1.7879 LREER−1 | +0.0475 LDY−1 | −0.6353 LM2−1 | +6.4357 |
| ||
|
| (0.5429) [−3.29331] | (0.50101) [0.094791] | (0.20508) [−3.09749] | (2.98432) [2.15650] |
| |
Short-run Estimated Error Correction Model: | |||||||
DLIMP = −0.34 ECT−1 | +0.02 DLIMP−1 | +0.24 DLREER_1 | +1.64 DLDY_1 | +0.91 DLM2−1 | −0.05 | ||
(0.1013) [−3.3768] | (0.1305) [0.1747] | (0.6868) [0.3484] | (0.5866) [2.7877] | (0.8551) [1.0604] | (0.0570) [−0.9058] | ||