Day

Hour

Description of the activities

Meteo-marine conditions

26/10

9.00

Installation of the instruments; Naples harbour

Calm sea

27/10

9.00

Installation of the instruments; Departure from the Naples harbor; Acquisition of seismic reflection; magnetometric and Chirp profiles; Echosounder

Calm sea

28/10

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GR85, GR57, GR55); Installation of a Trimble GPS as a second navigation system to cover the lack of signal in the survey area in proximity of the Naples harbour

Calm sea

29/10

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GR51, GR49, GR45, GR43)

Calm sea

30/10

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GR43, GR41, GR39, GR37, GR35, GR33, GR31)

Slightly rough sea

31/10

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GR31, GR29, GR27, GR25, GR23, GP49, GP47, GR21)

Slightly rough sea

01/11

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GR31, GR29, GR27, GR25, GR23, GP49, GP47, GR21)

Slightly rough sea

02/11

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GR11, GR15, GR17, GR19, GP11, GP15, GP19)

Slightly rough sea

03/11

9.00

Acquisition of seismic reflection, magnetometric and Chirp profiles; Echosounder (Lines GP23, GP27, GP31, GP35, GP39); From the 16.30 departure towards Ischia due to rough sea and meteorological stand-by

Rough sea

04/11

9.00

Stand-by. From the 16.30 seismic reflection, magnetometric and Chirp profiles; Echosounder (Line GP58)

Rough sea

05/11

9.00

Acquisition of magnetometric profiles; Echosounder (Lines GP56, GP54, GP52, GP50)

Rough sea