| Regression coefficient | Exp (regression coefficient) | Standard error | z value | p value |
Intercept | −1.445 | 0.2356813 | 0.1891 | −7.642 | 2.14 × 10−14 |
Length of train lines | 1.524 × 10−2 | 1.0153522 | 1.628 × 10−3 | 9.359 | <2 × 10−16 |
Number of through service train lines | 0.1229 | 1.1307447 | 3.776 × 10−2 | 3.254 | 1.14 × 10−3 |
Number of operating trains per hour during peak hours | −9.642 × 10−2 | 0.9080841 | 1.451 × 10−2 | −6.644 | 3.06 × 10−11 |
Number of transported passengers per hour during peak hours | 3.636 × 10−5 | 1.0000364 | 4.527 × 10−6 | 8.031 | 9.69 × 10−16 |
Number of trains according to type | −8.789 × 10−2 | 0.9158592 | 4.312 × 10−2 | −2.038 | 4.150 × 10−2 |
Number of connecting operation station | −4.418 × 10−2 | 0.9567818 | 2.183 × 10−2 | −2.023 | 4.303 × 10−2 |
Length of lines with connecting operation | 1.936 × 10−2 | 1.0195453 | 6.278 × 10−3 | 3.083 | 2.05 × 10−3 |