| Regression coefficient | exp (regression coefficient) | Standard error | z value | p value |
Intercept | −2.653 | 7.045479 × 10−2 | 0.5076 | −5.226 | 1.73 × 10−7 |
Length of train lines | 1.253 × 10−2 | 1.01260505 | 1.785 × 10−3 | 7.019 | 2.24 × 10−12 |
Number of through service train lines | 0.1630 | 1.17703050 | 4.255 × 10−2 | 3.831 | 1.28 × 10−4 |
Transportation capacity for each train during peak hours | 6.368 × 10−4 | 1.00063701 | 3.477 × 10−4 | 1.831 | 6.7027 × 10−2 |
Number of operating trains per hour during peak hours | −4.641 × 10−2 | 0.95465366 | 2.159 × 10−2 | −2.149 | 3.1596 × 10−2 |
Number of transported passengers per hour during peak hours | 1.704 × 10−5 | 1.00001704 | 8.356 × 10−6 | 2.039 | 4.1426 × 10−2 |
Number of trains according to type | −0.1800 | 0.83524205 | 4.973 × 10−2 | −3.620 | 2.94 × 10−4 |
Length of lines with connecting operation | 9.702 × 10−3 | 1.00974951 | 3.046 × 10−3 | 3.185 | 1.449 × 10−3 |