Regression coefficient

exp

(regression

coefficient)

Standard error

z value

p value

Intercept

−2.653

7.045479 × 10−2

0.5076

−5.226

1.73 × 10−7

Length of train lines

1.253 × 10−2

1.01260505

1.785 × 10−3

7.019

2.24 × 10−12

Number of through

service train lines

0.1630

1.17703050

4.255 × 10−2

3.831

1.28 × 10−4

Transportation capacity for each train during peak hours

6.368 × 10−4

1.00063701

3.477 × 10−4

1.831

6.7027 × 10−2

Number of operating trains per hour during peak hours

−4.641 × 10−2

0.95465366

2.159 × 10−2

−2.149

3.1596 × 10−2

Number of transported passengers per hour during peak hours

1.704 × 10−5

1.00001704

8.356 × 10−6

2.039

4.1426 × 10−2

Number of trains

according to type

−0.1800

0.83524205

4.973 × 10−2

−3.620

2.94 × 10−4

Length of lines with connecting operation

9.702 × 10−3

1.00974951

3.046 × 10−3

3.185

1.449 × 10−3