Variables

Measurement

Inputs

Quay Length

Total quay length in meters (m)

Terminal Area

Total size of terminal in hectare (Ha)

Quayside Cranes

Total number of quayside cranes

Yard Gantry Cranes

Total number of Gantry Cranes

Reach Stackers

Total number of Reach Stackers

Draught

Depth of Container Terminals (m)

Container Throughput Limit

Port Terminal Handling Capacity (TEU)

Outputs

Container Throughput

Annual Cargo Throughput (TEU)