Title/Description of the element | In this case |
Case name | Large Car Park |
Significant energy use | Ventilation and Lighting: electricity consumption in kWh |
data frequency/highest common interval between observation | 1/86,400 Hz (24 h) |
Baseline period | 5th November 2016-6th December 2016 |
ECM implementation | 1: 7th December 2016 2: 8th February 2017 3: 29th March 2017 |
Reporting period | 8th December 2016-31st July 2017 |
Achieved savings | 98,236 kWh |
95% prediction interval | +/− 48,195.81 kWh (49% of achieved savings) |
Regression model | Y = 698.396 − 322.982D1 − 94.815D2 − 45.233D3 |
R2 | 0.67 |
adj. Root mean squared error (RMSE) | 103.754 kWh |
Coefficient of variation CV(RMSE) | 0.31 |