Type |
Item |
Description |
Quantity (m3) |
Embodied energy (MJ) |
Cost (INR) |
| 1 |
Sub Structure |
PCC |
1:4:8 proportion |
3 |
1922 |
7857 |
| 2 |
SSM footing |
7 courses |
27 |
16,554 |
33,044 |
|
| 3 |
Plinth Beam |
1:1.5:3 proportion |
3 |
7516 |
19,215 |
|
| 4 |
Super Structure |
RC Beam |
1:1.5:3 proportion |
8 |
45,280 |
100,956 |
| 5 |
RC Column |
1:1.5:3 proportion |
4 |
19,518 |
42,472 |
|
| 6 |
RC Roof slab |
1:1.5:3 proportion |
29 |
65,019 |
177,314 |
|
| 7 |
RC Staircase & Railings |
1:1.5:3 proportion, Stainless steel |
3 |
39,163 |
170,643 |
|
| 8 |
Lintel, Sill & Chejja |
1:1.5:3 proportion |
10 |
24,204 |
62,589 |
|
| 9 |
Block Masonry |
200 mm & 100 mm wall |
89 |
59,811 |
272,296 |
|
| 10 |
Finishes |
Plastering |
1:6 mortar |
17 |
15,176 |
63,378 |
| 11 |
Putty |
Lime |
3 |
3772 |
8302 |
|
| 12 |
Painting |
Solvent borne |
3 |
37,834 |
67,393 |
|
| 13 |
Door, Windows with grill |
Sal wood & Teak wood |
6 |
37,956 |
364,623 |
|
| 14 |
Flooring and Dado |
Polished Granite & Ceramic tiles |
3 |
22,836 |
434,497 |
|
| TOTAL |
396,562 |
1,824,579 |
||||