Type

Item

Description

Quantity (m3)

Embodied energy (MJ)

Cost (INR)

1

Sub Structure

PCC

1:4:8 proportion

3

1922

7857

2

SSM footing

7 courses

27

16,554

33,044

3

Plinth Beam

1:1.5:3 proportion

3

7516

19,215

4

Super Structure

RC Beam

1:1.5:3 proportion

8

45,280

100,956

5

RC Column

1:1.5:3 proportion

4

19,518

42,472

6

RC Roof slab

1:1.5:3 proportion

29

65,019

177,314

7

RC Staircase & Railings

1:1.5:3 proportion, Stainless steel

3

39,163

170,643

8

Lintel, Sill & Chejja

1:1.5:3 proportion

10

24,204

62,589

9

Block Masonry

200 mm & 100 mm wall

89

59,811

272,296

10

Finishes

Plastering

1:6 mortar

17

15,176

63,378

11

Putty

Lime

3

3772

8302

12

Painting

Solvent borne

3

37,834

67,393

13

Door, Windows with grill

Sal wood & Teak wood

6

37,956

364,623

14

Flooring and Dado

Polished Granite & Ceramic tiles

3

22,836

434,497

TOTAL

396,562

1,824,579