# | Type | Item | Description | Quantity (m3) | Embodied energy (MJ) | Cost (INR) |
1 | Sub Structure | PCC | 1:4:8 proportion | 15 | 8981 | 35,355 |
2 | RC footing | 1:1.5:3 proportion | 11 | 35,593 | 88,471 | |
3 | RC Pedestal | 1:1.5:3 proportion | 4 | 20,206 | 46,568 | |
4 | Plinth Beam | 1:1.5:3 proportion | 5 | 18,245 | 44,045 | |
5 | Super Structure | RC Beam | 1:1.5:3 proportion | 10 | 70,863 | 152,988 |
6 | RC Column | 1:1.5:3 proportion | 10 | 86,036 | 175,260 | |
7 | RC Roof slab | 1:1.5:3 proportion | 36 | 87,596 | 231,879 | |
8 | RC Staircase & Railings | 1:1.5:3 proportion, Stainless steel | 3 | 39,228 | 170,641 | |
9 | Lintel, Sill & Chejja | 1:1.5:3 proportion | 10 | 24,283 | 62,589 | |
10 | Block Masonry | 150 mm and 10 mm wall | 69 | 55,339 | 248,582 | |
11 | Finishes | Plastering | 1:6 mortar | 17 | 16,222 | 63,378 |
12 | Putty | Lime | 3 | 3772 | 8302 | |
13 | Painting | Solvent borne | 3 | 37,834 | 67,393 | |
14 | Door, Windows | Sal wood & Teak wood frames and doors with steel grills | 6 | 37,956 | 364,623 | |
15 | Flooring and Dado | Polished Granite & Ceramic tiles | 3 | 25,242 | 353,640 | |
TOTAL | 567,396 | 2,113,714 |