Type

Item

Description

Quantity (m3)

Embodied energy (MJ)

Cost (INR)

1

Sub Structure

PCC

1:4:8 proportion

15

8981

35,355

2

RC footing

1:1.5:3 proportion

11

35,593

88,471

3

RC Pedestal

1:1.5:3 proportion

4

20,206

46,568

4

Plinth Beam

1:1.5:3 proportion

5

18,245

44,045

5

Super Structure

RC Beam

1:1.5:3 proportion

10

70,863

152,988

6

RC Column

1:1.5:3 proportion

10

86,036

175,260

7

RC Roof slab

1:1.5:3 proportion

36

87,596

231,879

8

RC Staircase & Railings

1:1.5:3 proportion, Stainless steel

3

39,228

170,641

9

Lintel, Sill & Chejja

1:1.5:3 proportion

10

24,283

62,589

10

Block Masonry

150 mm and 10 mm wall

69

55,339

248,582

11

Finishes

Plastering

1:6 mortar

17

16,222

63,378

12

Putty

Lime

3

3772

8302

13

Painting

Solvent borne

3

37,834

67,393

14

Door, Windows

Sal wood & Teak wood frames and doors with steel grills

6

37,956

364,623

15

Flooring and Dado

Polished Granite & Ceramic tiles

3

25,242

353,640

TOTAL

567,396

2,113,714