Supply chain main operations

kg CO2/dt (typical)

Generalized cost equation

GHG = kg/dt

Harvest and stack bales

25.0

G H G = 10.30 R 0.665 Y 0.447

R = fraction removed (decimal)

Y = yield (dt/ha)

Preprocessing (size reduction, densification, on farm storage)

146

G H G = 146 / Y

Y is throughput of the pelletizer (dt/h)

Biomass transport from farm to the hub (grain truck)

5.78

G H G = 0.087 L

L is distance travelled (km)

Assuming 50 km radius of truck travel

Rail transport from hub to biorefinery

9.10

G H G = 0.046 L

L is in km

Assuming 200 km travel for typical