PROCESS

SMV (min)

Capacity/hour

Target (unit/hour)

Actual Manpower

Joining Logo part with Front part

0.25

240

60

1

Front part Lining

0.70

86

60

1

Front part Piping

0.75

80

60

1

Zipper joint with Front part

0.33

180

60

1

Side toton Stitching

0.20

300

60

1

Side toton piping

0.19

324

60

1

Joining Side toton with front part

0.47

129

60

1

Handle joining and Lining Front part

0.75

80

60

1

Front part Piping

0.80

75

60

1

Top part Lining

0.32

189

60

0.50

Top & Back part Piping

0.19

324

60

0.50

U-part Lining

0.42

144

60

0.50

Top and U-part joining through Zipper

0.62

97

60

1

Zipper Joint with U-part

0.62

97

60

1

Binding Top part

0.42

144

60

0.50

Looping Top part

0.13

450

60

0.50

Trolley cover Lining and Zipper joining

0.97

62

60

1

Handle joining with Gadget part (Bottom part)

0.30

200

60

1

Lining Bottom part

0.42

144

60

1

Two needle on Top and Bottom part (Gadget part)

1.20

50

60

1

Handle Joining with Back part

0.33

180

60

1

Back part Lining

1.25

48

60

1

Back part Piping

0.67

90

60

1

Joining Gadget and Back part

0.42

144

60

1

Add Front part with Combined part

0.75

80

60

1

Binding

0.33

180

60

0.50

Cutting Excess Stirring

1.00

60

60

1

Total

14.44

4178

1620

24