Project Name

Water flow

(m3/day)

TDH (m)

Power (Wp)

End-use

Convenience store in Macossa

5

85

480

Human consumption

Cheline and Muabsa Electrification

10

45

690

Human consumption

Pumping system of Mudaca

17

54

600

Human consumption

Pandjane Electrification

15

70

900

Animal consumption

Chupanga Electrification

10

33

700

Human consumption

Tinonganine and Djabula Electrification

10

-

-

Human consumption