Plot

Sampling Date

Organic Matter (%)

Phosphorus (ppm)

Potassium (ppm)

NO3 (ppm)

NH4 (ppm)

Control 1

7/11/2018

2.7 ± 0.26

46 ± 10.41

87 ± 2.31

5 ± 1.15

17 ± 7.02

Glynwood-Mississinewa

Clay Loam Plots

7/11/2018

2.3 ± 0.07

13 ± 5.47

104 ± 9.30

4 ± 1.00

5.5 ± 3.46

Control 2

7/11/2018

2.1 ± 0.40

13 ± 13.87

106 ± 10.07

7 ± 3.21

7 ± 4.00

Blount Silt Loam Plots

7/11/2018

2.1 ± 0.13

10.3 ± 2.22

107.5 ± 10.34

2.8 ± 0.50

10.5 ± 0.57

Control 3

7/11/2018

2 ± 0.47

15 ± 20.22

129 ± 32

3 ± 1.15

7 ± 2.52

Glynwood Silt Loam Plots

7/11/2018

2.4 ± 0.21

18 ± 5.35

121.3 ± 18.19

3.8 ± 1.50

13 ± 2.58