Plot

Sampling Date

Organic Matter (%)

Phosphorus (ppm)

Potassium (ppm)

NO3 (ppm)

NH4 (ppm)

Control 1

8/22/2017

3.2 ± 0.26

26 ± 10.41

91 ± 2.31

5 ± 1.15

3 ± 7.02

Glynwood-Mississinewa

Clay Loam Plots

8/22/2017

3.1 ± 0.27

14 ± 4.64

96.2 ± 9.15

8 ± 0.45

3.6 ± 0.89

Control 2

8/22/2017

2.9 ± 0.40

40 ± 13.87

86 ± 10.07

13 ± 3.21

3 ± 4.00

Blount Silt Loam Plots

8/22/2017

3 ± 0.42

19 ± 8.29

99.8 ± 19.03

3 ± 0.82

3.5 ± 1.00

Control 3

8/22/2017

2.7 ± 0.47

46 ± 20.22

65 ± 32.00

5 ± 1.15

4 ± 2.52

Glynwood Silt Loam Plots

8/22/2017

3.3 ± 0.53

20 ± 13.39

81 ± 13.09

3.5 ± 10.03

8 ± 0.58