Time Step 1 of Stress Period 8, Water Budget of the Whole Model Domain | |||
Flow Term | In | Out | In-Out |
Storage | 5.714e+06 | 5.934e+06 | −2.194e+05 |
Constant Head | 1.368e+04 | 2.184e+04 | −8.159e+03 |
Wells | 7.765e+03 | 0.000e+00 | 7.765e+03 |
Drains | 0.000e+00 | 0.000e+00 | 0.000e+00 |
Recharge | 2.194e+05 | 0.000e+00 | 2.194e+05 |
ET | 0.000e+00 | 4.326e−03 | −4.326e−03 |
River Leakage | 1.947e−02 | 1.273e+02 | −1.273e+02 |
Head Dep Bounds | 0.000e+00 | 0.000e+00 | 0.000e+00 |
Stream Leakage | 0.000e+00 | 0.000e+00 | 0.000e+00 |
Interbed Storage | 0.000e+00 | 0.000e+00 | 0.000e+00 |
Reserv. Leakage | 0.000e+00 | 0.000e+00 | 0.000e+00 |
Sum | 5.955e+06 | 5.956e+06 | −4.496e+02 |
Discrepancy [%] | −0.01 |