Time Step 1 of Stress Period 1, Water Budget of the Whole Model Domain:

Flow Term

In

Out

In-Out

Storage

1.2483e+07

1.2500e+07

−1.6699e+04

Constant Head

1.3680e+04

2.3001e+04

−9.3211e+03

Wells

7.0310e+03

0.0000e+00

7.0310e+03

Drains

0.0000e+00

0.0000e+00

0.0000e+00

Recharge

1.8650e+04

0.0000e+00

1.8650e+04

ET

0.0000e+00

3.7281e−04

−3.7281e−04

River Leakage

1.9798e−02

1.2733e+02

−1.2731e+02

Head Dep. Bounds

0.0000e+00

0.0000e+00

0.0000e+00

Stream Leakage

0.0000e+00

0.0000e+00

0.0000e+00

Interbed Storage

0.0000e+00

0.0000e+00

0.0000e+00

Reserv. Leakage

0.0000e+00

0.0000e+00

0.0000e+00

Sum

1.2522e+07

1.2523e+07

−4.6630e+02

Discrepancy [%]

0