Factor | Cronbach’s Alpha if Item Deleted of factor | Risk | Cronbach’s Alpha if Item Deleted of risks |
Risk of Subcontractors design (R1) | 0.786 | r1.1 | 0.743 |
r1.4 | 0.756 | ||
r1.5 | 0.757 | ||
r1.6 | 0.747 | ||
Risk of Subcontractors materials, supplies, equipment and machines (R2) | 0.673 | r2.1 | 0.755 |
r2.3 | 0.749 | ||
r2.4 | 0.751 | ||
Subcontractor of construction (R3) | 0.861 | r3.1 | 0.747 |
r3.2 | 0.726 | ||
r3.4 | 0.724 | ||
r3.5 | 0.739 |