Parameter | Point Estimate | Standard Error | Per cent Coef. of Variation | 95 Percent Confidence Interval | |
Jubilee Stratum—A | |||||
h (0) | 0.12026E−03 | 0.68143E−04 | 56.66 | 0.41243E−04 | 0.35066E−03 |
p | 0.96564E−01 | 0.54716E−01 | 56.66 | 0.33116E−01 | 0.28157 |
EDR | 128.96 | 36.536 | 28.33 | 73.403 | 226.57 |
Jubilee Stratum—B | |||||
h (0) | 0.87888E−04 | 0.18425E−04 | 20.96 | 0.57990E−04 | 0.13320E−03 |
p | 0.13213 | 0.27700E−01 | 20.96 | 0.87182E−01 | 0.20025 |
EDR | 150.85 | 15.812 | 10.48 | 122.33 | 186.02 |