Equipment | Max. power rating (kWe) | Daily operation Time (h) | Daily energy consumption (kWh) |
Feedstock storage facility | 7 | 12 | 84 |
Macerator | 38 | 4 | 152 |
Screw feeder | 7 | 4 | 28 |
Pump | 100 | 4 | 400 |
Hygienization unit | 9 | 4 | 36 |
Anaerobic digester | 8 | 24 | 192 |
Storage tank | 7 | 24 | 168 |
Biogas PSA unit | 95 | 24 | 2.28 × 103 |
Hydrogen compressor Comp1 | 12.5 | 24 | 300 |
Hydrogen compressor Comp2 | 165 | 24 | 3.96 × 103 |
Auxiliary loads | 25 | 16 | 400 |
Total | 473.5 | 164 | 8,000 |