Number of experiments | 5 | 6 | 7 | 8 | |
Controller | On-off | PID | RBF-PID | e-RBF-PID | |
Heating process | Settling time [s] | N/A | 435 | N/A | 272 |
Unsteady-state energy Eus [kWh] | 5.63 × 10−3 | 5.37 × 10−3 | 4.80 × 10−3 | 3.84 × 10−3 | |
Maintenance process | Length of steady-state period tss [s] | N/A | 65 | N/A | 228 |
Steady-state energy Ess [kWh] | N/A | 3.45 × 10−4 | N/A | 1.19 × 10−3 | |
Steady-state energy intensity EIss [kW] | N/A | 5.31 × 10−6 | N/A | 5.22 × 10−6 | |
Absolute mean static error [˚C] | N/A | 0.37 | N/A | 0.19 |