Project phase of risk assessment processes performance | Importance of risk assessment at design phase of project | Total | ||
| Not so important | Fairly important | Very important | |
| Freq (%) | Freq (%) | Freq (%) | Freq (%) |
Design | 0 (0.0) | 0 (0.0) | 14 (100.0) | 14 (100.0) |
E Tendering/Contract Award | 0 (0.0) | 6 (42.9) | 8 (55.1) | 14 (100.0) |
E Production | 0 (0.0) | 0 (0.0) | 4 (100.0) | 4 (100.0) |
E Design and Production | 0 (0.0) | 0 (0.0) | 2 (100.0) | 2 (100.0) |
E Tendering/Contract and Production | 3 (50.0) | 3 (50.0) | 0 (0.0) | 6 (100.0) |
E NA | 0 (0.0) | 6 (30.0) | 14 (70.0) | 20 (100.0) |
E Total | 3 (5.0) | 15 (25.0) | 42 (70.0) | 60 (100.0) |