Project phase of risk assessment processes performance

Importance of risk assessment at design phase of project

Total

Not so important

Fairly important

Very important

Freq (%)

Freq (%)

Freq (%)

Freq (%)

Design

0 (0.0)

0 (0.0)

14 (100.0)

14 (100.0)

E Tendering/Contract Award

0 (0.0)

6 (42.9)

8 (55.1)

14 (100.0)

E Production

0 (0.0)

0 (0.0)

4 (100.0)

4 (100.0)

E Design and Production

0 (0.0)

0 (0.0)

2 (100.0)

2 (100.0)

E Tendering/Contract and Production

3 (50.0)

3 (50.0)

0 (0.0)

6 (100.0)

E NA

0 (0.0)

6 (30.0)

14 (70.0)

20 (100.0)

E Total

3 (5.0)

15 (25.0)

42 (70.0)

60 (100.0)