Trials

Array Location

Period of Trials

Quantity

Geometry of Modules

Reflective Materials

Trail 1

Upper Array

November 18-December 2

Five-Three Wired

Flush Mount

Medium Brown Shingles

Lower Array

Three

Flush Mount

Medium Brown Shingles

Trail 2

Upper Array

December 2-December 31

Five-Three Wired

Flush Mount

White Tiocoat/Swarco Beads

Lower Array

Three

Flush Mount

White Tiocoat/Swarco Beads

Trail 3

Upper Array

January 1-January 29

Three

Flush Mount

White Tiocoat/Swarco Beads

Lower Array

Three

Horizontal Mount

White Tiocoat/Swarco Beads

Trail 4

Upper Array

January 30-February 22

Three

Flush Mount

White Tiocoat/Swarco Beads

Lower Array

Three

Flush Mount

White Tiocoat/Swarco Beads

Trail 5

Upper Array

February 23-March 9

Three

Flush Mount

Aluminum Paint

Lower Array

Three

Flush Mount

White Tiocoat/Swarco Beads

Trail 6

Upper Array

March 29-April 30

Three

Flush Mount

Aluminum Paint

Lower Array

Three

Flush Mount

Medium Brown Shingles