Trials | Array Location | Period of Trials | Quantity | Geometry of Modules | Reflective Materials |
Trail 1 | Upper Array | November 18-December 2 | Five-Three Wired | Flush Mount | Medium Brown Shingles |
| Lower Array |
| Three | Flush Mount | Medium Brown Shingles |
Trail 2 | Upper Array | December 2-December 31 | Five-Three Wired | Flush Mount | White Tiocoat/Swarco Beads |
| Lower Array |
| Three | Flush Mount | White Tiocoat/Swarco Beads |
Trail 3 | Upper Array | January 1-January 29 | Three | Flush Mount | White Tiocoat/Swarco Beads |
| Lower Array |
| Three | Horizontal Mount | White Tiocoat/Swarco Beads |
Trail 4 | Upper Array | January 30-February 22 | Three | Flush Mount | White Tiocoat/Swarco Beads |
| Lower Array |
| Three | Flush Mount | White Tiocoat/Swarco Beads |
Trail 5 | Upper Array | February 23-March 9 | Three | Flush Mount | Aluminum Paint |
| Lower Array |
| Three | Flush Mount | White Tiocoat/Swarco Beads |
Trail 6 | Upper Array | March 29-April 30 | Three | Flush Mount | Aluminum Paint |
| Lower Array |
| Three | Flush Mount | Medium Brown Shingles |