| Construction of section | Drilling parameters | Note | ||
| Angle (˚) | Orientation (˚) | Depth (m) | ||
| No. 1 drilling | 0 | 90 | 100 | Place the receivers |
| No. 2 drilling | 0 | 90 | 80 | Place the sources |
| No. 3 drilling | −5 | 90 | 100 | Place the receivers |