| No. | Processes | Time (hours) |
| 23 | Reception of aluminum boards | 1.67 |
| 24 | Cladding and framing preparation | 3.28 |
| 25 | Cladding and framing stripping | 4.55 |
| 26 | Assembly of the set | 1.12 |
| 27 | Welding of the set | 1.50 |
| 28 | Hot rolling and annealing | 8.83 |
| 29 | Blister inspection | 0.54 |
| 30 | Cold rolling | 1.08 |
| 31 | Initial cut | 3.43 |
| 32 | Four processes on fuel plates (FP) | 8.37 |
| 33 | Final cut | 2.86 |
| 34 | Surface treatment | 2.21 |
| 35 | Dimensional inspection and second radiography of FP | 3.89 |
| 36 | Scratching test | 1.67 |
| 37 | Stripping of FP and FE components | 6.33 |
| 38 | FE assembly | 6.82 |
| 39 | Quality control | 3.37 |
| 40 | Nozzle fixation | 1.06 |
| 41 | Handling pin fixation | 0.86 |
| 42 | FE dimensional control | 0.96 |
| 43 | FE cleaning and packing | 1.12 |
| 44 | Delivery of the finished FE | 0.48 |
|
| TOTAL | 56.50 |