No.

Processes

Time (hours)

23

Reception of aluminum boards

1.67

24

Cladding and framing preparation

3.28

25

Cladding and framing stripping

4.55

26

Assembly of the set

1.12

27

Welding of the set

1.50

28

Hot rolling and annealing

8.83

29

Blister inspection

0.54

30

Cold rolling

1.08

31

Initial cut

3.43

32

Four processes on fuel plates (FP)

8.37

33

Final cut

2.86

34

Surface treatment

2.21

35

Dimensional inspection and second radiography of FP

3.89

36

Scratching test

1.67

37

Stripping of FP and FE components

6.33

38

FE assembly

6.82

39

Quality control

3.37

40

Nozzle fixation

1.06

41

Handling pin fixation

0.86

42

FE dimensional control

0.96

43

FE cleaning and packing

1.12

44

Delivery of the finished FE

0.48

TOTAL

56.50