No. | Initial Basic Feasible Solution (BS) | Optimal Result (OR) | Percentage of Deviance (PD) from (OR) | Perfectness of Result | |||||||||
NWCM | LCM | ATCM | LCMM | NWCM | LCM | ATCM | LCMM | NWCM | LCM | ATCM | LCMM | ||
Ex-1 | 273 | 236 | 236 | 209 | 209 | 30.6 | 12.9 | 12.9 | 0.00 | NOR | NOR | NOR | EOR |
Ex-2 | 425 | 310 | 285 | 285 | 285 | 49.1 | 8.7 | 0.00 | 0.00 | NOR | NOR | EOR | EOR |
Ex-3 | 635 | 510 | 510 | 510 | 510 | 24.5 | 0.00 | 0.00 | 0.00 | NOR | EOR | EOR | EOR |
Ex-4 | 4160 | 3500 | 3320 | 3320 | 3320 | 25.3 | 5.4 | 0.00 | 0.00 | NOR | NOR | EOR | EOR |