Model Summary

Model

R

R Square

Adjusted R Square

Std. Error of the Estimate

Change Statistics

R Square Change

F Change

df1

df2

Sig. F Change

1

0.826a

0.682

0.682

0.33760

0.682

803.560

1

374

0.000

ANOVA

Model

Sum of Squares

df

Mean Square

F

Sig.

1

Regression

91.582

1

91.582

803.560

0.000b

Residual

42.625

374

0.114

Total

134.207

375

Coefficients

Model

Unstandardized Coefficients

Standardized Coefficients

t

Sig.

Collinearity Statistics

B

Std. Error

Beta

Tolerance

VIF

1

(Constant)

1.073

0.069

15.571

0.000

Project Identification

0.596

0.021

0.826

28.347

0.000

1.000

1.000