FFA With SVC and TCSC at a Line Contingency State | Transmission Line Outage [Sending Receiving End Bus] | Maximum Loadability in p.u | Critical Voltage in p.u @ bus | Optimal SVC Bus No. | Optimal TCSC Line | SVC in MVAR | XTCSC in p.u |
IEEE 30 Bus System | [18 19] | 2.714 | 0.9501 @ 8 | 15 | [15 18] | 17.4309 | 0.0123 |
IEEE 57 Bus System | [9 12] | 14.11 | 0.9758 @ 1 | 24 | [24 26] | 58.5261 | 0.0084 |
IEEE 118 Bus System | [69 75] | 54.512 | 0.9392 @ 53 | 17 | [17 113] | 29.4520 | 0.0080 |