|
| N | Minimum | Maximum | Mean | Std. Deviation | Skewness | |
| Statistic | Statistic | Statistic | Statistic | Statistic | Statistic | Std. Error | |
| ERI | 202 | 1.00 | 4.80 | 3.7505 | 0.81205 | −0.086 | 0.171 |
| BRI | 202 | 1.00 | 5.00 | 3.8673 | 0.90495 | −0.266 | 0.171 |
| TRI | 202 | 1.00 | 5.00 | 3.8871 | 0.93081 | −0.300 | 0.171 |
| ECM Project Success | 202 | 1.00 | 5.00 | 2.1139 | 0.84181 | 0.528 | 0.171 |